Forum quick links
Existing road
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Heather Holdridge on
The development (landscape and new chiller yard) associated with our LEED project reaches across a road that is owned by the city and not the client.
Hybrid Urinals
CI-2009 WEc1:Water Use Reductionposted by Nilda De Coutte on
Hi, I would like to know if anyone has any information (case study, formal review, experience with) of any of the hybrid urinals currently available in the market.
Consider exercise classes frequency?
Pilot-Credits EQpc78:Design for active occupantsposted by Ping Zhou on
The credit requirement requests lists of exercise equipment or opportunities provided to FTE to indicate the amount can simultaneously serve more than 5% of FTE.
parking area under cover
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by ANNA SUN on
my Project is in Shanghai China.I am preparing PI Form form my project. Now I have a question about parking area.
Supermarket in a spead shopping center.
Retail-NC-v2009 MPR3:Must use a reasonable site boundaryposted by Heraldo Muñoz on
Hello, My name is Heraldo and I am leading the LEED NC-Retail 2009, certification of a 5000 m2 supermarket that is inside of a 100.000 m2 shopping mall and has numerous stores, walkways, parking
Is Green Tag certification accpetable
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Shuchita Gupta on
Hi , I wanted to know if green tag ( an Australian rating ) acceptable instead of BIFMA / GREENGUARD , a furniture manufacturer which has greentag is claiming to us that LEED accepts this . Thank
new version od LEEDonline form
CI-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
I was checking sample LEEDonline forms for this prerequisite which can be found on USGBC website and I nonticed that there is a new version of EAp2 form - v6.
Reducing Volume of stormwater runoff through 2 improvements
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by VICTOR MORENO on
Hello, Our project is based on the case 2.
just doing a survey is incentivized
EBOM-v4 LTc1:Alternative transportationposted by Tristan Roberts on
I wanted to note a key feature of this credit in v4, which was brought to my attention by Dan Ackerstein and Hannah Sokol.
earn a point using v4 credit
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Tristan Roberts on
I wanted to note a key feature of this credit in v4, which was brought to my attention by Dan Ackerstein and Hannah Sokol.