I was checking sample LEEDonline forms for this prerequisite which can be found on USGBC website and I nonticed that there is a new version of EAp2 form - v6. However this form is completely different than the prevous one (v4). The form is similar to the one for C&S projects and requires energy simulation. Is this how the LEEDonline form looks like if I register a new project now? Is energy simulation required now as part of the prerequisite?