documenting uneven male/female occupancyNC-2009 WEp1: Water Use Reductionposted by Marni J Evans on Feb 22, 2012, 3:08 pm
Hello All, Can you please provide your insight? We have a NC project in Mexico on the cusp of LEED platinum and we've just received our prelim review which asks us to justify our uneven... Last reply: Jonathan Weiss, May 14, 2012, 9:09 am |
|
CHP systemNC-2009 EAp2: Minimum Energy Performanceposted by Tarek Dalati on Jun 11, 2012, 11:07 am
in the project we are modelling, hot water system is preheated from the building power generators by using recovery system isntalled on the genertars ( same principle of the recovery chillers)... Last reply: Tarek Dalati, Jun 27, 2012, 4:06 pm |
|
Excluded SpacesNC-2009 IEQc6.1: Controllability of systems - lightingposted by Greengrade User on Jul 16, 2012, 6:02 pmacross use types. I think that this document will answer many questions listed on this forum, so let's try to spread the word! Lauren Log in or register to post comments Ellen Mitchell LEEDuser Basic... Last reply: Lauren Sparandara, Mar 26, 2013, 12:43 pm |
|
Polished ConcreteNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Brynn Horley on Jul 24, 2012, 10:44 am
I have had contractors submit an argument that acetone is exempt from IEQ considerations. Is that true? Last reply: Dwayne Fuhlhage, Aug 7, 2012, 11:50 am |
|
IEQp1 Review CommentsNC-2009 IEQp1: Minimum indoor air quality performanceposted by Marina Andrade on Oct 11, 2012, 1:29 pmmade, by others in this forum topic, submitting a TAB for the ventilation prerequisite is what should be provided to prove the rates were indeed changed after the design completion. You should be able... Last reply: Hernando Miranda, Oct 29, 2012, 6:14 pm |
|
Multiple building- Energy Modeling2NC-2009 EAc1: Optimize Energy Performanceposted by Marina Andrade on Dec 11, 2012, 8:59 am
Hi, I'm working in another project that is attempting multiple building certification. Some of the buildings are connected by walkways and vertical circulation, i.e., there is only one... Last reply: Marina Andrade, Dec 17, 2012, 11:42 am |
|
Applicable version of water use reduction additional guidanceNC-2009 WEp1: Water Use Reductionposted by Tiffany Moore on Dec 27, 2012, 1:32 am
I've seen several versions of this question posted, none of which appears to have been answered, so I'll ask it again. What version of the water use redcuction additional guidance should... Last reply: Batya Metalitz, Jan 18, 2013, 4:25 pm |
|
Exterior Lighting Power for Non-Tradable SurfacesNC-2009 EAc1: Optimize Energy Performanceposted by Kai Andrade on Mar 7, 2013, 10:55 pm
This question is about the modeling the exterior lighting in accordance with ASHRAE 90.1-2007. I received a comment from the LEED Reviewer that the Non-tradable exterior light power in the... Last reply: Paul Cimaglia, May 9, 2013, 10:38 am |
|
Filtering requirementsNC-2009 SSc6.2: Stormwater design - quality controlposted by Mike D on Oct 2, 2013, 8:42 am
If we capture rainwater and... Last reply: Michael DeVuono, Nov 13, 2013, 2:36 pm |
|
steel BOF and EAFNC-2009 MRc4: Recycled Contentposted by Courtney Royal on Nov 6, 2013, 11:33 am
A lot of steel manufactures are providing a "LEED" letter that includes both... Last reply: Tim Crowley, Dec 3, 2013, 5:21 pm |