Forum quick links
VOC Limit - Thread Cutting Oils
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jason Biondi on
What is VOC limit for "Thread Cutting Oils" as per SCAQMD Standards to comply with LEED requirements ?
Cycle lane between project and Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, I have a quick question and I would very much appreciate if someone could assist. I understand from the LEED guidance that there is no requirement for provision of a dedicated cycle lane be
Building area to site area ratio
CS-2009 PIf2:Project Summary Detailsposted by Giuseppina Amorusi on
Hi, I am doing an office tower (19 stories above grade).
Cycle lane between project and Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Alicia Costas Freire on
Hello, My understanding from the LEED manual is that the credit does not require provision of a dedicated cycle lane between the building and the bicycle network and I was wondering if someone cou
Preferred Parking
Retail-NC-v2009 SSc4:Alternative transportationposted by Kevin Flynn on
The LEED NC-Retail v2009 credit 4.3 and 4.4 to provide preferred parking for LEV/FE vehicles and Carpools appears to require that the project identify employee parking separate from customer parkin
Low-Emitting Signage Wording Requirements
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Annalise Reichert on
I am working on a project that reserved 10 parking spots for "fuel-efficient" vehicles, this is noted by spray-painted signage on each parking stall.
Design Appeal Stage
posted by Omar Elrawy on
Dear all, I'am in the "design appeal" stage now, I'am willing to accept the final design review, but I have two questions: 1.
source of air for mechanical Ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Alan Viale on
We have a project that is natural ventilated in perimeter spaces (circulations and cafe dining rooms), and It is mechanical ventilated in core spaces (meeting rooms and cafe dining room) that is pu
Free Certification
posted by Charalampos Giannikopoulos on
Does USGBC still offer to refund LEED certification fees to the first LEED certified project in a country with no LEED projects at all?
Adoption of Investigated Strategies
NC-v4 IPc1:Integrative processposted by Philippa Cameron on
Do you need to adopt all strategies that you demonstrate as facilitating best energy performance for this credit?