Dear all,
I'am in the "design appeal" stage now, I'am willing to accept the final design review, but I have two questions:
1. I have denied credits that have been reviewed only once (IEQp2 was reviewed during preliminary review and I didn't change its status since then, and IEQc7.2 that was reviewed during final design). Now I can't mark any of these two credits as "open for update", I need to know if I will be able to mark them as "open for update" after clicking "Accept" or not?
2. I have IEQc2 denied for the second time, the reviewer states that I can re-submit TAB results during appeal, my question is, if I click "Accept" now, will I be able to appeal this credit only during the construction appeal stage or not?
Thanks
Saud Abdul Rasheed
Sustainability/Energy Engineer, CEM, PMP, LEED AP BD+C, LEED AP O+M, Estidama PQP23 thumbs up
October 27, 2015 - 5:06 am
1) You will be able to "open for update" after accepting the review. The thing is that you get two reviews for each pre-requisite/credit. After that you will have to appeal if you want a third review. For your credit IEQc7.2 if you had submitted it for review first time during final design review you will get another round of review with construction review.
2) Yes you will be able to appeal any credit during the construction appeal stage after paying the appeal fee for the credit.