Forum quick links
Conveying systems now accepted for this credit
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
Location of Co2 sensors
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Stella Stella on
Hi, We have a project where in IEQ C1 was attempted when almost the construction was already completed.
Case 2
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Mike D on
The project has 2500 FTE and occupies more than 75% of the building space. The building has only 5 parking spaces, so cannot meet the 5% required for the carpool/vanpool.
Stormwater Management Plan
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Nisreen Alhussein on
I cant find clear cut for Stormwater Management Plan definition, i mean is it using both structural and non structural plans to achieve stormwater quality control?
Roof area exempt from the SSc7.2 calculation
NC-2009 SSc7.2:Heat Island Effect—Roofposted by FABIO VIERO on
We have a project with a terrace that is about 50% of the building roof.
MEP related insulation
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Linda Davisson on
The credit language indicates "insulation" as one of the materials subject to this credit.
Building Envelope Trade Off
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
I have 2 questions about EAp2. 1.
Planting in conservancy areas
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Roberto Meza on
Hi everyone, We have a project in a greenfield, it's conservancy areas consist of vegetation that is mostly dry grass.
What is the consulting cost for 5 year EBOM recertification?
posted by Corey Lee Wilson on
Thanks Tristan for being a valuable resource on this matter.
Minimum building energy performance
ND-Plan-v4 GIBp2:Minimum building energy performanceposted by sam Alfassy on
based on the fact that we are on a planning stage only, what would be the documentation that approves compliance to this requirement.