Forum quick links
Shopping Mall with all basic amenities
CI-2009 SSc2:Development Density and Community Connectivityposted by Stella Stella on
Our project is located in the central district and is located very close to a shopping mall with almost all basic amenities located within them.
ASHRAE 90.1 2007 Section 9.4.1 Automatic Lighting Shutoff
CI-2009 EAp2:Minimum Energy Performanceposted by Ashonta Langdon on
Hello! We're working on a TI office project of less than 5,000 sf in a building that is larger than 5,000 sf.
Energy Modeling Guidance
NC-2009 EAc1:Optimize Energy Performanceposted by Ralph Bicknese on
We are modeling a gym in Guatemala where we will have no heating or cooling system but will have mechanical ventilation.
Mixed building
NC-2009 EAc1:Optimize Energy Performanceposted by Khaled Fouda on
Utility rates is a confusing thing for me, I am working on a building that has 9% Retail Area, 7% Church and the rest is a Residential Area.
Recycling a Hard-to-Recycle Waste Stream
CI-2009 IDc1:Innovation in Designposted by Cara Blumenthal on
Would an innovation credit or a pilot credit similar to the following be considered legitimate? Or is the scope too narrow?
Conducting Survey: Mid-Week OK?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Wendy Lao on
SSc4 requires the survey to be conducted either (1) each day over 5 consecutive workdays) or (2) at the conclusion of 5 consecutive workdays.
Mixing Solar PV, LED Lighting and LEED GA Accreditation
posted by Daniel Valdes on
Hi, I recently received my accreditation as a Green Associate. I'm currently working in Solar PV & LED Lighting company that does consulting, design and installation of these systems.
projected Perlite
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Emmanuel Pauwels on
We are using projected perlite on the inside of the building as a fire-resitance.
Identifying the Baseline Areas
NC-2009 WEc1:Water Efficient Landscapingposted by Maya Karkour on
Dear All, I want to double check on how to allocate the Baseline areas for my project. My proposed project has 100 sq.m of trees, 300 sq.m of shrubs, and only 5 sq.m of turf grass. Shall I alloc
excluding part of the site from the LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Ann Plautz on
I am working on a project where the LEED Boundary had already been set prior to my participation. The project is a Streetcar Vehicle maintenance facility owned on a City block owned by a City.