Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Just Want to Know

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  PAWAN DAHIWAL  on 

It may be a silly question. If both both low sloped and steep sloped roof material is same, why steep sloped roof requires lower SRI paint?

1
Mon Apr 14, 2014, 3:04 pm

IO Credit _ Option B (Additional Strategies)

EBOM-2009 RPc1:Regional Priority
posted by  Pal Ahuja  on 

For our first LEED Canada EB & M Rating System project, We are working to achieve innovation in operations credits by using Option B(1-4 Points) that allows to propose your own strategy (one no

1
Thu Mar 10, 2016, 4:15 am

USGBC Credit Library Access

General forums
posted by  Marilou Denum  on 

Hello All, I am preparing for the LEED AP BD+C exam and I tried to access the Credit Library on the USGBC website and for some reason when I get inside the credit library - Commercial Interiors-Re

1
Fri Apr 18, 2014, 2:18 pm

Suspended Ceiling

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

Dear all, I have a suspended ceiling with a 60 cm air gap between the panels and the reinforced concrete slab where all the electro-mechanical lies, but it doesn't act as plenum zone si

1
Mon Apr 14, 2014, 6:17 pm

Smoking zone - away from pedestrian traffic

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Devani PERERA  on 

Hello, We have recently received a remark from a review that our designated smoking zone is not compliant since it is not 25 feet away from concentrations of building occupants and pedestrian traff

1
Fri May 23, 2014, 4:16 am

Credit Pending due to type of Manufactures documentation

Schools-2009 MRc4:Recycled Content
posted by  Todd Bundren  on 

The manufactures that supplied the steel for my job all have some form of the following line in their support documentation for the recycled content: The Manufacture...utilizes the Basic Oxygen F

1
Mon Apr 14, 2014, 4:19 pm

Cinemas and Family Entertainment Shops in a Mall

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear All, I have a couple of questions regarding the space types listed in ASHRAE 90.1 Table 9.6.1 (Space-by-Space Method): 1) For underground car parking, the closest space type is the "Parking

1
Mon Apr 14, 2014, 6:10 pm

MPR6 - Option 1

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Paula Jarrett Nasta  on 

Are the USGBC Energy and Data Release form and proof of registration with Energy Star required to be submitted with the PI Form 1 for the LEED Design phase review?

1
Wed Apr 23, 2014, 6:25 pm

Construction Specifications to incentivize LEED

General forums
posted by  Lawrence Lile  on 

I do a lot of work with a large university that has "optional" sustainability requirements. This is frustrating for contractors - what happens if they miss, say, 75% construction waste diversion?

0

Development Density Exemplary Performance - Site Area

CS-2009 SSc2:Development Density and Community Connectivity
posted by  Emmanuel Gee  on 

If I go for the exemplary performance credit but use path 2, I would need to show 120,000 SF/acre in a site area twice my base.

1
Sat Nov 28, 2015, 2:03 am