Forum quick links
Calculation error
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Magda Aghababyan on
Hi, Do we have to count the number of absentees in to the total number of regular occupants responded to the survey?
Problem with Fan Power input for System 6
CS-2009 EAp2:Minimum Energy Performanceposted by Morteza Kasmaei on
Dear Experts, I am straggling to input Fan Power in the baseline model (System 6 - Packaged VAV with PFP Boxes) and have the following issues: 1- In Table 1.4.6 - General HVAC, there is a note f
Classroom Entrances
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Eddie Cuevas on
I am working on a project located on a college campus. The project building features an exposed atrium located in the center of the building.
campus energy - pieces of the pie
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
On our campus AG projects, We have a central plant providing energy for 6 buildings. Only three of the buildings are LEED projects.
ESC plan language
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Aldo Pazo on
Hello everybody. Can we submitt in LEED Online our ESC Plan in other language different than English? for example in Spanish? Thank you!
Option 1 - Projects with Internal Streets
ND-v2009 NPDp3:Connected and open communityposted by Michael Smithing on
Our project is a mixed use office/retail/park development with only one internal street crossing the site. In determining whether to apply Option 1 or Option 2 to our project, it appears that the
Some questions on LEED volume program
posted by Grace Ming on
I need some advice on the LEED volume certification program.
Simpson Diversity Index score
ND-v2009 NPDc4:Mixed-income diverse communitiesposted by Scott Preston on
Elliot, After running this calcualtion our score is 0.597318339. Do we round this up to 0.6 as is the case in many other LEED calculations?
HVAC Equipment Installation prior to Roof
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Maggie Pipek on
The contractor would like to install the HVAC equipment although the roof is not on the building yet.
Construction impact zone for infill
ND-v4 GIBc7:Minimized site disturbanceposted by Colin Day on
Hi Eliot, If a project is an infill, has been previously graded and already contains streets, would it meet the requirements of this credit? Also, if no historic trees existed in this (an old hay