I am working on a project located on a college campus. The project building features an exposed atrium located in the center of the building. This atrium leads to entrances to enclosed hallways on two sides. However, on one floor there is an outdoor hallway (with no entrance) that features numerous classrooms and lecture halls. Would entryway systems be required for these classroom and lecture hall entrances?