Forum discussion

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control

Classroom Entrances

I am working on a project located on a college campus. The project building features an exposed atrium located in the center of the building. This atrium leads to entrances to enclosed hallways on two sides. However, on one floor there is an outdoor hallway (with no entrance) that features numerous classrooms and lecture halls. Would entryway systems be required for these classroom and lecture hall entrances?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 09/03/2013 - 19:36

Hi Eddie, Are the entrances from the outdoor hallway into the classrooms the main entrances? If so, each room will need an entryway system to meet the credit intent.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.