The contractor would like to install the HVAC equipment although the roof is not on the building yet. It would seem to me that as long as the contractor protects the equipment from moisture and contaminents this should still be in compliance with LEED requirements. They are not planing on using the equipment. Is there anything I am missing or should warn the contractor about?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Allison Beer McKenzie
Architect, Director of SustainabilitySHP Leading Design
LEEDuser Expert
646 thumbs up
September 5, 2013 - 1:12 pm
As long as the equipment is well protected, I can't think of any reason why this strategy would not be ok.