Topic | Recent |
---|---|
Filling out the C&D waste CalculatorNC-v4 MRc5: Construction and demolition waste managementposted by Jenelle Shapiro on May 18, 2016, 12:05 pma similar but more detailed question on this same subject at https://leeduser.buildinggreen.com/forum/regulation-commingled-recycling-facilities#comment-53854. Please look on that forum for an answer. Log... Last reply: RETIRED, Feb 25, 2019, 6:34 pm |
|
Simple box modelNC-v4 IPc1: Integrative processposted by Edgar Arevalo on May 1, 2017, 5:49 pm
Ok.... So I'm working on my first LEED v4 BD+C project, and we're looking to pursue the IP credit. As I'm already generating simple box energy model, the requirements state that I target at... Last reply: Oliver Pearce, Oct 11, 2019, 6:08 am |
|
Using CBECS 2012 Data for Estimating Energy ConsumptionCI-v4 EAp2: Minimum Energy Performanceposted by Oliver Bate on Sep 6, 2017, 5:40 am
I have multiple office projects where there is no consumption data available as the tenants are new to the building- we are going with Option 2 Minimum Energy Performance. To estimate... Last reply: Shane Trexler, May 15, 2018, 8:18 pm |
|
Tenant Guidelines credit substitution to v4?CS-2009 SSc9: Tenant Design and Construction Guidelinesposted by Maria Porter on Sep 20, 2017, 5:34 amwith multiple individuals or committees to gain the necessary approvals or changes. And I just want to remind LEED Canada users reading this discussion forum, that direction was provided for this issue in Credit... Last reply: Allen Cornett, Jan 23, 2020, 11:10 am |
|
tenants meters data collection requirementCS-v4 EAc3: Advanced Energy Meteringposted by Ricardo Sá on Dec 21, 2017, 10:52 amvariations section. Maybe USGBC could add "advanced" in the requirements as well. @Pedro, in case you clarify further with USGBC, could you please add your findings here in the forum? Log... Last reply: Julio Fernandez Amodia, Nov 22, 2023, 5:39 am |
|
Multiple Buildings in One Energy SimulationNC-2009 EAp2: Minimum Energy Performanceposted by PAWAN DAHIWAL on Apr 11, 2018, 6:40 am
Hi, Group Approach: There are 3 owner occupied buildings (same type) within LEED boundary serve by the common (central) HVAC system. Energy modelling software is capable... Last reply: Manuel Romera Molina, Jun 17, 2024, 10:54 am |
|
Vague extraction location distanceNC-2009 MRc5: Regional Materialsposted by Edgar Arevalo on Aug 26, 2019, 11:08 am
I have been receiving LEED material forms along with submittal documents for each materials where they provide an exact distance between the manufacturing site and the project site, but when it... Last reply: Edgar Arevalo, Aug 27, 2019, 3:48 pm |
|
ASHRAE 90.1 requirementsNC-v4 EAp2: Minimum Energy Performanceposted by Guillaume Rose on Oct 1, 2019, 5:28 am
Hi, I work on a Core & Shell project based in Paris and i have a question about ASHRAE 90.1 Standards, and more especially on the possibility to derogate to certain requirements. On... Last reply: Marcus Sheffer, Apr 11, 2024, 12:38 pm |
|
INpc136Pilot-Credits INpc136: Safety First: Re-Enter Your Workspaceposted by Agnes Vorbrodt on Aug 20, 2020, 5:56 pm
My Client found the AIA document very helpful in learning about global best practices in preventing COVIC infection at her building. Daily surveys: the requirement for management was aligned with... Last reply: Maria Munoz, Nov 21, 2023, 3:07 pm |
|
LEED v5 BD+C/ID+C Materials and Resources public commentsLEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Nadav Malin on Apr 3, 2024, 6:25 am
Share your comments on the first public comment draft of the LEED v5 BD+C/ID+C Materials and Resources category on this forum. You can reply to this thread or use the "Post a Question or Comment... Last reply: Jodie Thill, May 24, 2024, 1:31 pm |