Forum quick links
Water Efficiency in Industrail Projects
Pilot-Credits WEpc18:Appliance and process water use reductionposted by Steve Beck on
We are constructing a large expansion to a dairy products manufacturing plant which the owner desires to certify.
emergency Stairs
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Omar Elrawy on
I have an emergency staircase, which won't be used except in case of fire, and this staircase (core) is completely separate from the building's HVAC system, with an exhaust fan only, without any Ai
retention basin and infiltration on site
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Adrienn Gelesz on
I am a little confused: The reference guide states that average TSS removal of an infiltration basin is 75% (50-100%).
Occupant feedback
EBOM-2009 IEQp3:Green Cleaning Policyposted by Sheryl Swartzle on
The sample cleaning policy under "documents toolkit" section 15 states all "guest and employees" shall have a mechanism by which to provide feedback on cleaning practices.
How many signs are required for preferred parking?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Susan Di Giulio on
I am working on a project in California. CALGreen, the state green building code section, requires that a certain number of parking stalls be designated as "CLEAN AIR" spaces.
Provision of bus schedules as evidence
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Rebecca Hart on
We are pursuing the exemplary performance element of this credit, as the site is extremely well served by bus routes (just counting the main bus lines, we have over 706 compliant bus rides/day).
M&V Versus Ongoing Sub-Metering & Monitoring
NC-2009 EAc5:Measurement and Verificationposted by Andrew Ellsworth on
I am glad to have a forum like LEEDuser to ask this question, since this has mystified me for many years.
Hi,
Our project is 133,624
NC-2009 PIf3:Occupant and Usage Dataposted by Mike D on
Hi, Our project is 133,624 sf.
Phased Project Executed Under Different Construction Contracts
posted by Blake Thames on
After having registered our project (LEED NC for Schools) it was determined that the building would be constructed in two phases, one right after the other, with Phase 1 being occupied while Phase
LEED MRc5 Form Table
NC-2009 MRc5:Regional Materialsposted by Nicholas Klever on
I am a first timer at Documenting LEED credits. I am working on MR credit 5 - regional materials.