Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Water Efficiency in Industrail Projects

Pilot-Credits WEpc18:Appliance and process water use reduction
posted by  Steve Beck  on 

We are constructing a large expansion to a dairy products manufacturing plant which the owner desires to certify.

1
Tue Nov 5, 2013, 5:48 pm

emergency Stairs

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Omar Elrawy  on 

I have an emergency staircase, which won't be used except in case of fire, and this staircase (core) is completely separate from the building's HVAC system, with an exhaust fan only, without any Ai

1
Fri Jun 21, 2013, 2:21 pm

retention basin and infiltration on site

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Adrienn Gelesz  on 

I am a little confused: The reference guide states that average TSS removal of an infiltration basin is 75% (50-100%).

1
Mon Jul 1, 2013, 4:51 pm

Occupant feedback

EBOM-2009 IEQp3:Green Cleaning Policy
posted by  Sheryl Swartzle  on 

The sample cleaning policy under "documents toolkit" section 15 states all "guest and employees" shall have a mechanism by which to provide feedback on cleaning practices.

1
Wed Jul 10, 2013, 2:19 pm

How many signs are required for preferred parking?

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Susan Di Giulio  on 

I am working on a project in California. CALGreen, the state green building code section, requires that a certain number of parking stalls be designated as "CLEAN AIR" spaces.

1
Thu Jun 20, 2013, 1:44 pm

Provision of bus schedules as evidence

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  Rebecca Hart  on 

We are pursuing the exemplary performance element of this credit, as the site is extremely well served by bus routes (just counting the main bus lines, we have over 706 compliant bus rides/day).

1
Thu Jun 27, 2013, 8:27 pm

M&V Versus Ongoing Sub-Metering & Monitoring

NC-2009 EAc5:Measurement and Verification
posted by  Andrew Ellsworth  on 

I am glad to have a forum like LEEDuser to ask this question, since this has mystified me for many years.

1
Thu Jun 20, 2013, 3:32 pm

Hi,
Our project is 133,624

NC-2009 PIf3:Occupant and Usage Data
posted by  Mike D  on 

Hi, Our project is 133,624 sf.

1
Thu Jul 25, 2013, 6:34 pm

Phased Project Executed Under Different Construction Contracts

LEED Guidance for Campuses and Multiple Buildings
posted by  Blake Thames  on 

After having registered our project (LEED NC for Schools) it was determined that the building would be constructed in two phases, one right after the other, with Phase 1 being occupied while Phase

1
Thu Jun 27, 2013, 4:28 am

LEED MRc5 Form Table

NC-2009 MRc5:Regional Materials
posted by  Nicholas Klever  on 

I am a first timer at Documenting LEED credits. I am working on MR credit 5 - regional materials.

1
Mon Nov 4, 2013, 12:26 am