We are constructing a large expansion to a dairy products manufacturing plant which the owner desires to certify. Both ourselves (CM) and the design team are concerned about the projects ability to meet WE PR1. To us, the reference manual is less than clear as to how we must treat process water. This is significant as the process water is 90%+ of the total water usage.
This is a regulated facility so there are limitations on the techiques that can be employed.
Can anyone share any experiences with similar situations
Thx
Tristan Roberts
RepresentativeVermont House of Representatives
LEEDuser Expert
11478 thumbs up
November 5, 2013 - 12:48 pm
Steve, I'm sorry, but this post kind of got lost here. It would be better to post it to our WEp1 forum.