I am a little confused: The reference guide states that average TSS removal of an infiltration basin is 75% (50-100%). However, from several comments and the sample uploaded I get the feeling that if you infiltrate all rainwater on site then 100% removal can be achieved. Can someone help with this issue? If using a basin that collects and infiltrates all rainwater, can you use the 100%?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.