Forum quick links
Concrete Curing Compound & Sealer
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Thomas McDermott on
I apologize if this was addressed in earlier comments. I looked but didn't find any conclusive answers.
A weighted sound level
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Emmanuel Pauwels on
The ANSI norm S12.60-2002 refers to IEC 61672-1 in order to define the A-weighted sound level. Is it allowed to use values from local code based on an acustic map of the city?
Access to a Bicycle Network
Pilot-Credits PC30:Alternative Transportationposted by Jon Texter on
Has anyone had problems with access to a bicycle network? We are currently working on a project in Eugene, OR where there is a very extensive network of bike trails/paths.
Mandatory provisions.
CS-2009 EAp2:Minimum Energy Performanceposted by Ron Dean on
Good day, I need to understand some thigs about 5.4, 8.4 and 10.4 of standar ashrae 90.1-2007.(My project is in Perú) 5.4- 5.4.1-'' Where insulation is required in 5.5 or 5.6, it shall comply with
EAp2 Submittal Form problem
CS-2009 EAp2:Minimum Energy Performanceposted by Esteban Undurraga on
Dear all, I have just completed the EAp2 submittal with all the info and uploads associated, but when I put "Check Compliance", it does not turns the "N" (no) to a "Y" (yes).
Fan Power Limitation Pressure Drop Adjustment
CS-2009 EAp2:Minimum Energy Performanceposted by Yu Wang on
Hallo everyone, I am modeling a C&S project with 8 floors, and system 7 will be used in the Baseline Case.
Shower at Sauna
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Natascha Altensen on
Hi We are currently dealing with a hotel project that has saunas installed.
What defines "purchased?"
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by David Gray on
I'm not trying to split a new hair here, but what constitutes "purchased" for the purposes of credits such as MRc2?
ID Credit - Building as a Teaching Tool
NC-2009 IDc1:Innovation in Designposted by Jody Boelhauf on
I am working on a building for a University and they are wanting to have a "Digital Dashboard" or a "Vital Sign" for the building.
MPR #6 - CI project without submetered utilities
posted by samala hartley on
What is the procedure to fill out form PIf1 in regards to using the exception for a CI project without sub metered utilities?