Backup Unit

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by     on 

I am working on a project where the main unit is new and thus in compliance but there is a backup unit which uses CFCs.

1
Tue Nov 1, 2011, 2:34 pm

Systems Manual

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Michael Lofroos  on 

Although it is the requirement of the Commissioning Agent to develop the Systems Manual, Operation & Maintenance Systems manuals, can he/she delegate that responsibility to the General Contract

1
Fri Nov 18, 2011, 4:13 pm

One Conductivity Meter for Multiple towers

EBOM-2009 WEc4:Cooling Tower Water Management
posted by  Jessica Hawley  on 

On our project building there is only one system meter. All cooling towers are interconnected with a single header which is monitored by the conductivity meter.

1
Fri Oct 21, 2011, 9:48 pm

PDF Template Question

CI-2009 MRc4:Recycled Content
posted by  elizabeth warlop  on 

Hello, I may have a question similar to above. In regards to the costs that get included in table L-3 CSI Divisions 3-10 as well as Table L-4 CSI Division 12.

1
Mon Nov 21, 2011, 6:36 am

Building on parking spaces

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Tanja Arnesson  on 

Hi, My project will be built on a parking space that today have at least 300 parking spaces, the new project will have a parking garage that containing at most 230 parking spaces.

1
Mon Oct 3, 2011, 8:32 pm

Credit Calculations

Pilot-Credits PC19:Whole Building Reuse
posted by  Christine Robbins-Elrod  on 

Hi, I'd like to verify if I have documented this Pilot Credit correctly? -I have included exterior windows in the building envelope calculations since the team is preserving all existing windows (b

0

LEED Project boundary and EAp2, EAc1

NC-2009 EAp2:Minimum Energy Performance
posted by  Kim Sosalla-Bahr  on 

The project is a new facility, which has a new construction and renovation component. The new building is 6 stories tall, adjacent to an existing 3 story plus roof deck building.

1
Mon Oct 10, 2011, 3:50 pm

Points for Provision of "Sun Pipes" Under innovation

NC-2009 IDc1:Innovation in Design
posted by  Yong Lee Low  on 

I am working on a factory project at Jakarta, Indonesia. They are using Sun Pipes to illuminate the work spaces in the office area(at level 2).

1
Tue Nov 1, 2011, 11:41 pm

Would a Warehouse need to have Occupancy Sensors?

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Augusto Velazquez   on 

Our project includes an office area and a warehouse area. The office area will have occupancy sensors for each office, bathroom, corridors, etc. The warehouse will not have sensors.

1
Fri Oct 14, 2011, 2:35 am

Count LED conversion for EBOM MRc4?

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Molly ODONNELL  on 

Can MRc4 be used on EBOM project purchasing LED troffers instead of any CFLs? (Building is in the process of converting all fixtures to LED, thereby eliminating the mercury.)

1
Sat Oct 29, 2011, 5:59 pm