Backup Unit
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by on
I am working on a project where the main unit is new and thus in compliance but there is a backup unit which uses CFCs.
Systems Manual
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Michael Lofroos on
Although it is the requirement of the Commissioning Agent to develop the Systems Manual, Operation & Maintenance Systems manuals, can he/she delegate that responsibility to the General Contract
One Conductivity Meter for Multiple towers
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Jessica Hawley on
On our project building there is only one system meter. All cooling towers are interconnected with a single header which is monitored by the conductivity meter.
PDF Template Question
CI-2009 MRc4:Recycled Contentposted by elizabeth warlop on
Hello, I may have a question similar to above. In regards to the costs that get included in table L-3 CSI Divisions 3-10 as well as Table L-4 CSI Division 12.
Building on parking spaces
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Tanja Arnesson on
Hi, My project will be built on a parking space that today have at least 300 parking spaces, the new project will have a parking garage that containing at most 230 parking spaces.
Credit Calculations
Pilot-Credits PC19:Whole Building Reuseposted by Christine Robbins-Elrod on
Hi, I'd like to verify if I have documented this Pilot Credit correctly? -I have included exterior windows in the building envelope calculations since the team is preserving all existing windows (b
LEED Project boundary and EAp2, EAc1
NC-2009 EAp2:Minimum Energy Performanceposted by Kim Sosalla-Bahr on
The project is a new facility, which has a new construction and renovation component. The new building is 6 stories tall, adjacent to an existing 3 story plus roof deck building.
Points for Provision of "Sun Pipes" Under innovation
NC-2009 IDc1:Innovation in Designposted by Yong Lee Low on
I am working on a factory project at Jakarta, Indonesia. They are using Sun Pipes to illuminate the work spaces in the office area(at level 2).
Would a Warehouse need to have Occupancy Sensors?
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Augusto Velazquez on
Our project includes an office area and a warehouse area. The office area will have occupancy sensors for each office, bathroom, corridors, etc. The warehouse will not have sensors.
Count LED conversion for EBOM MRc4?
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Molly ODONNELL on
Can MRc4 be used on EBOM project purchasing LED troffers instead of any CFLs? (Building is in the process of converting all fixtures to LED, thereby eliminating the mercury.)