Hello,
I may have a question similar to above. In regards to the costs that get included in table L-3 CSI Divisions 3-10 as well as Table L-4 CSI Division 12.
AM I correct to assume that the totals in the table according to LEED should be the same as the totals that have been quoted above where we listed the 'actual material costs' at the tops of each sheet?
Thank you very much for any help you can give on this.