Log in
Forum
Topic

performance period date extension

Performance Period
posted by Elizabeth Seidel on Jul 27, 2022, 11:56 am

We are submitting a v4 EB-OM project and need to know if the performance period for all credits ends on the same date and two (2) credits need to be extended to two weeks later - is that...

v4.1 Addenda and Trips

NC-v4.1 LTc5: Access to quality transit
posted by Jessica Eskro on Jan 18, 2022, 2:57 pm

In the 4.1 addenda section it states:

• For each qualifying transit route, total trips (inbound and outbound) are counted towards the threshold.

Does this mean that I can count each...

Last reply: Emily Purcell, Jul 27, 2022, 11:47 am

Local Standards Comparisons as Required Documents

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Nate Shroyer on Jul 27, 2022, 9:10 am

others on this forum who have been through a review of the comparison document recently!  Log in or register to post comments 1 Vote up! ...

Last reply: Emily Purcell, Jul 27, 2022, 10:13 am

Store in a shopping mall with discontinuous boundaries

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by Thomas Krysinski on Jul 27, 2022, 9:43 am

I am working on the LEED v4 ID+C certification of a store located in a shopping mall. The store is divided in two parts by the mall. Knowing that the shopping mall is not part of the scope of the...

Campus DES/CHP and EA Credit Optimize Energy Performance

NC-v4 EAc2: Optimize Energy Performance
posted by Vahid Kompany on Jul 26, 2022, 2:19 pm

Hello All,

Has anyone applied for and used Pilot Credit EApc120 for projects served by district energy to document additional performance improvement to achieve points under Energy...

Natural ventilation Parking garages

NC-v4 EQp1: Minimum indoor air quality performance
posted by Antonio Galicia on Jul 26, 2022, 5:11 pm

Hi everyone

I'm working on an office building where is necessary to design natural ventilation for the parking zones. In order to achieve the ventilation requirements, it's enough to have...

Common corridors in residential building

NC-2009 EAp2: Minimum Energy Performance
posted by Panupant Phapant on Jul 14, 2016, 10:31 pm

Hi Marcus,

My current project is a 40-story hotel building, which has 35 residential levels and 5 non-residential public-space levels. On the residential levels, the common corridors are...

Last reply: Santiago Avila, Jul 26, 2022, 8:17 pm

Bonus for hyper-local sourcing

NC-v4.1 MRc3: Sourcing of Raw Materials
posted by Kim Shinn on May 23, 2019, 10:59 am

for that credit, either. Depending on the outcome of this discussion, I'll post something in the Forum for MRc4. Log in or register to post comments Summer Gorder Owner ecoREAL LEEDuser Premium Member 63 thumbs...

Last reply: Gail Vittori, Jul 26, 2022, 3:32 pm

Water Restoration Certificates Pilot Credit

NC-v4 INc1: Innovation
posted by Lissa Spitz on Sep 13, 2018, 10:50 am

Hi, can anyone confirm if the volume is supposed to be for the baseline or design annual water use?

thanks!

Last reply: Aliesa Adelman, Jul 26, 2022, 12:06 pm

Choosing the correct rating system

Data-Centers-NC-v4 MPR3: Must comply with project size requirements
posted by Dina El-Sady on Jul 26, 2022, 9:45 am

A data cebter building with the white area contributing to only 7% of the total BUA while the rest are offices, elec rooms , video rooms...etc , should it be treated as a data center rating...