Drywall replaced on int. non-structural wall

NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Marisa Britton  on 

If a non-structural wall is to have the studs remain but the drywall replaced, will that area still qualify for the MRc1.2 calculation?

0

opaque building envelope construction

NC-v4 EAp2:Minimum energy performance
posted by  Ahmed El-Semary  on 

i need to know what is required to be filled exactly in roof construction and whatis meant by building ID ??

6
Mon Sep 18, 2017, 1:25 pm

Group approach

LEED Guidance for Campuses and Multiple Buildings
posted by  Subramaniam Chandrasekaran  on 

we are looking into one campus with four buildings plus a food court; intend to register under CS; there is one virtual boundary for the whole campus; all four buildings are coming up together; sin

3
Sun Sep 17, 2017, 6:53 am

Flooring & "categories"

NC-v4 EQc2:Low emitting materials
posted by  Erin Holdenried  on 

Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did?  All flooring adhesives, coatings, sealers, grout, etc.?  In Table 5 of the refer

0

Flooring & "categories"

NC-v4 EQc2:Low emitting materials
posted by  Erin Holdenried  on 

Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did?  All flooring adhesives, coatings, sealers, grout, etc.?  In Table 5 of the refer

0

Anticipated Tenant Fit Out

CS-2009 PIf3:Occupant and Usage Data
posted by  Paula Hernandez  on 

Background: In a C&S building we suggest a Tenant fit out to comply with credit IEQ_c8.2, where we show meeting rooms, corridors and an office space layout resulting in a grater quantity of peo

3
Fri Sep 15, 2017, 8:56 pm
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 15, 2017, 4:26 pm

Basement renovation to a LEED Platinum Building

LEED Recertification: When and How
posted by  Faith Wilbert  on 

How do you go about a renovation in a LEED Plaitnum building? Do you have to do a recertification or another process. Theay are renovating 1 floor and I'm not sure the approach I need to take

1
Mon Apr 30, 2018, 11:23 pm

LEED V3 WEc1 V06 form Missing Resource?

NC-2009 WEc1:Water Efficient Landscaping
posted by  Melissa Merryweather  on 

We use 100% non-potable water in our project but the LEED v06 form still requires 50% reduction from baseline, but there is no calculator on the form and none separately available under Resources.

1
Fri Sep 15, 2017, 3:09 pm

underground infiltration structure LID?

CS-v4 SSc4:Rainwater management
posted by  Jens Apel  on 

I am not quite sure if the approach discussed in my project team is a viable way to achieve this credit and would like to check back with you.

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri Sep 15, 2017, 10:50 am