Drywall replaced on int. non-structural wall
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Marisa Britton on
If a non-structural wall is to have the studs remain but the drywall replaced, will that area still qualify for the MRc1.2 calculation?
opaque building envelope construction
NC-v4 EAp2:Minimum energy performanceposted by Ahmed El-Semary on
i need to know what is required to be filled exactly in roof construction and whatis meant by building ID ??
Group approach
posted by Subramaniam Chandrasekaran on
we are looking into one campus with four buildings plus a food court; intend to register under CS; there is one virtual boundary for the whole campus; all four buildings are coming up together; sin
Flooring & "categories"
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did? All flooring adhesives, coatings, sealers, grout, etc.? In Table 5 of the refer
Flooring & "categories"
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did? All flooring adhesives, coatings, sealers, grout, etc.? In Table 5 of the refer
Anticipated Tenant Fit Out
CS-2009 PIf3:Occupant and Usage Dataposted by Paula Hernandez on
Background: In a C&S building we suggest a Tenant fit out to comply with credit IEQ_c8.2, where we show meeting rooms, corridors and an office space layout resulting in a grater quantity of peo
Museum additional interior lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Luis Andrade on
Hello,
Basement renovation to a LEED Platinum Building
posted by Faith Wilbert on
How do you go about a renovation in a LEED Plaitnum building? Do you have to do a recertification or another process. Theay are renovating 1 floor and I'm not sure the approach I need to take
LEED V3 WEc1 V06 form Missing Resource?
NC-2009 WEc1:Water Efficient Landscapingposted by Melissa Merryweather on
We use 100% non-potable water in our project but the LEED v06 form still requires 50% reduction from baseline, but there is no calculator on the form and none separately available under Resources.
underground infiltration structure LID?
CS-v4 SSc4:Rainwater managementposted by Jens Apel on
I am not quite sure if the approach discussed in my project team is a viable way to achieve this credit and would like to check back with you.