Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Bikes & Showers for Multiple Buildings

CS-v4 LTc6:Bicycle facilities
posted by  Sanyog Rathod  on 

We have three Core & Shell Buildings on one site. They are pursuing seperate certifications, and because of the small size of the projects, we are not doing a campus or group certification.

1
Tue Jan 15, 2019, 3:31 pm

Option 2 Budget Calculation - Mechancial Adhesives and Sealants

CI-v4 EQc2:Low emitting materials
posted by  Gina Rahmann  on 

If pursuing the budget calculation method, how do you capture the layer surface area for mechanical products such as duct sealants, pipe sealants, firestop, etc.

1
Thu Jun 14, 2018, 8:17 pm

Do Recycling Rooms need to be Negatively Pressurized?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Nicole Pandolfo  on 

Do recycling rooms need to be negatively pressurized to meet the requirements of Interior Cross-Contamination Prevention in LEED V4 now that recylcing rooms must include the collection of batteries

1
Wed May 11, 2022, 8:18 am

Process Loads

NC-2009 EAp2:Minimum Energy Performance
posted by  Paula Hernandez  on 

Hello, I am modeling a bulding where wine is made (don´t know how to say it in English, sorry), the thing is that there are many spaces in the project that have AHU just to process or store the wi

11
Thu Sep 21, 2017, 3:47 pm

EB Certification process before the construction is finished

Performance Period
posted by  JEONGJAE LEE  on 

Hello, I have a question about the EB certification process since it is my first job having work on O+M project. I would be very thankful if I would be able to get any answer on it here.

1
Thu Nov 16, 2017, 11:41 pm

MRc2 Option 2

General forums
posted by  Pamela Lippe  on 

Can anyone tell me what certifications exist that "verify impact reductions below industry average" for the following? • global warming potential (greenhouse gases), in CO2e; • depletion of the s

3
President
e4inc
LEEDuser Premium Member
31 thumbs up
Thu Sep 21, 2017, 8:19 am

Very Minimum Wood Product

CS-2009 MRc6:Certified Wood
posted by  Michael Wahjudi  on 

Hi our development is having stringent requirement for fire safety. Hence the amount of wood product is very minimum. Only 1 or 2 wooden doors.

1
Thu Sep 21, 2017, 1:42 pm

Metered Lav Faucets No More

NC-v4 WEp2:Indoor water use reduction
posted by  Michelle Rosenberger  on 

I am posting this comment here in addition to the CI forum because there haven't been any responses to questions posed on that forum and I am hoping to get Dylan's take on the removal of the metere

4
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Thu Sep 21, 2017, 4:18 am

LEED EBOM EA1 PR2 - Casino Hotels

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Aron Weis  on 

If a 6,000,000 square foot hotel/casino is more than 50% hotel space, are they required to use Option 1 - Portfolio Manager to get an Energy Star rating?

0

Issues & Benefits Log - seeking clarification

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Joyce Kelly  on 

Trying to figure out how the Benefits side of this Log might work.

1
Fri Sep 22, 2017, 3:10 am