Bikes & Showers for Multiple Buildings
CS-v4 LTc6:Bicycle facilitiesposted by Sanyog Rathod on
We have three Core & Shell Buildings on one site. They are pursuing seperate certifications, and because of the small size of the projects, we are not doing a campus or group certification.
Option 2 Budget Calculation - Mechancial Adhesives and Sealants
CI-v4 EQc2:Low emitting materialsposted by Gina Rahmann on
If pursuing the budget calculation method, how do you capture the layer surface area for mechanical products such as duct sealants, pipe sealants, firestop, etc.
Do Recycling Rooms need to be Negatively Pressurized?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Nicole Pandolfo on
Do recycling rooms need to be negatively pressurized to meet the requirements of Interior Cross-Contamination Prevention in LEED V4 now that recylcing rooms must include the collection of batteries
Process Loads
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hello, I am modeling a bulding where wine is made (don´t know how to say it in English, sorry), the thing is that there are many spaces in the project that have AHU just to process or store the wi
EB Certification process before the construction is finished
posted by JEONGJAE LEE on
Hello, I have a question about the EB certification process since it is my first job having work on O+M project. I would be very thankful if I would be able to get any answer on it here.
MRc2 Option 2
posted by Pamela Lippe on
Can anyone tell me what certifications exist that "verify impact reductions below industry average" for the following? • global warming potential (greenhouse gases), in CO2e; • depletion of the s
Very Minimum Wood Product
CS-2009 MRc6:Certified Woodposted by Michael Wahjudi on
Hi our development is having stringent requirement for fire safety. Hence the amount of wood product is very minimum. Only 1 or 2 wooden doors.
Metered Lav Faucets No More
NC-v4 WEp2:Indoor water use reductionposted by Michelle Rosenberger on
I am posting this comment here in addition to the CI forum because there haven't been any responses to questions posed on that forum and I am hoping to get Dylan's take on the removal of the metere
LEED EBOM EA1 PR2 - Casino Hotels
EBOM-2009 EAc1:Optimize Energy Performanceposted by Aron Weis on
If a 6,000,000 square foot hotel/casino is more than 50% hotel space, are they required to use Option 1 - Portfolio Manager to get an Energy Star rating?
Issues & Benefits Log - seeking clarification
NC-v4 EAp1:Fundamental commissioning and verificationposted by Joyce Kelly on
Trying to figure out how the Benefits side of this Log might work.