Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Estimate annual energy use of the office outside U.S.

CI-v4 EAc4:Renewable energy production
posted by  Ameet AA  on 

The project is in Ho Chi Minh city - tropical climate, so there is no demand for heating and the office will use only electricity.

1
Fri Nov 24, 2017, 5:57 pm

Combining option 1 and 2

CS-v4 SSc2:Site development - protect or restore habitat
posted by  Emmanuel Pauwels  on 

Our project is a zero lot line. We would be able to install a green roof for 20% of the project site surface which is not enough since the treshold is 30%.

0

IN Credit 2: LEED Accredited Professional

CI-v4 INc2:LEED Accredited Professional
posted by  Allen Cornett  on 

To achieve this credit must you have a LEED AP ID+C as a principal participant, or can you have a LEED AP BD+C as a principal participant on a commercial interiors project and still achieve this cr

3
Default Avatar
LEEDuser Basic Member
27 thumbs up
Thu Nov 23, 2017, 8:57 am

design case water calculation

NC-v4 WEc2:Indoor water use reduction
posted by  Azaz Ansari  on 

why is the no information  required to enter in design water calculation to accomodate visitors? 

Please note we have visitor column in calculation sheet.

1
Mon Dec 4, 2017, 5:16 pm

Defaut Rated-Power

CI-v4 EAp2:Minimum energy performance
posted by  Len Sciarra  on 

does anyone know if there is a default table for equipment and appliances with rated power in V4 like there was in V3? Thanks

0

Does open space need to be conserved over some period of time?

Schools-NC-v4 SSc3:Open space
posted by  Amy McLean  on 

Does documentation from the school district/owner need to be provided certifying that open space for this credit will not be developed?

0

Innovative design approaches for adaptability?

Pilot-Credits PC34:Design for Adaptability
posted by  Liz Rhodes  on 

Verbiage in the Pilot Credit on USGBC.com states only an "accessible level" is required.  Therefore, does this exclude levels that are accessible by elevator?  This statement implies that

0

Airside HVAC

Schools-EBOM-v4 EAp2:Minimum energy performance
posted by  John   on 
What capacity and CFM value should be entered in the minimum energy performance calculator (air side HVAC tab) for HVAC systems when the capacity value is made to "eQuest default" in order to reduce t
0

Main Building Utility Meter Data Acquisition

CS-v4 EAp3:Building-level energy metering
posted by  Michael Costello  on 

Do Main Building Utility Meters have to automatically transmit monthly data to to the BMS system managing the the whole building energy data?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Nov 22, 2017, 6:51 am

SSc5.2: Case 1 or Case 3?

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Elliot Powers, LEED AP BD+C  on 

Greetings from Taiwan! Our project is located in a science park that does have requirements for "open space" and "green space," which would indicate that we employ Case 1 to achieve this credit.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Nov 22, 2017, 1:58 am