Water Metering (prereq and credit)
Warehouses-NC-v4 WEc4:Water meteringposted by Ryan McEvoy on
If a project installs one meter for the building (essentially collectively metering indoor plumbing fixtures and domestic hot water) and another meter for irrigation water, what are the ramificatio
Membrane roof - materials at interior side of vapor barrier?
NC-v4 EQc2:Low emitting materialsposted by Joanna Switzer on
Hi all,
Constuction Waste plan for Option 2
CI-v4 MRp2:Construction and demolition waste management planningposted by Deborah Stadler on
If a contractor is opting for Option 2 under the Construction and Demolition Waste Management credit, (less that 2.5 lbs/sf) do they still need to plan for Option 1 indicating the 5 streams to obta
Baseline Fan Power Calculation - Pressure Drop Adjustment
NC-2009 EAp2:Minimum Energy Performanceposted by Gopinath Vasu on
Hi All,
New Chemical Fire Inhibitor
posted by Carolyn Day on
A colleague just pointed out an article about M-Fire. Its a factory applied fire inhibitor for wood construction. It's GreenGuard Gold but I can't find any real information.
Newly Posted FAQs for BPDO: Material Ingredients
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Nadav Malin on
We've just posted a set of frequently asked questions (FAQs) for this credit!
MR4, MR5 Credit Default Percentage For Unavailable Information
NC-2009 MRc4:Recycled Contentposted by Jack McCaskill on
The steel supplier for the structures contractor on our project has gone out of business and thus information regarding MR4 Recycled Content, and MR5 regional materials information is unavaila
Are there any trade off if using the Existing chiller
NC-2009 EAp2:Minimum Energy Performanceposted by sriram tetali on
Hi all,
The project is an industrial buildings
CALGreen Alternative Compliance for IEQc4.1 and 4.2
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jenelle Shapiro on
I'm aware of the CALGreen Alternative compliance path for achieving these two credits, but the requirement states that an approved building permit or final certificate of occupancy in order to be c