Forum quick links
Manual or automatic glare-control devices
NC-v4 EQc7:Daylightposted by Mugdha Mokashi on
Is it absolutely essential to have manual or glare-control devices in all of the regularly occupied spaces?
EPA-Exempt Products
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Heather DeGrella on
How have others handled EPA-exempt products that aren't found on the SF list?
Least Toxic and Non always Toxic
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by maria aurora palacio on
We have an on going LEED EBOM project and currently GBCI is reviewing our documents being submitted.
Latest review comments based on LEEDUser policy template
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Michelle Raigosa on
I just received these review comments for this credit (we used the LEEDUser suggested policy template): The IPM plan includes pyrethrum as a suggested treatment for flies on page seven, but pyreth
Can an employee in LEED consultant firm who was not involved in the project be the CxA ?
CI-v4 EAc1:Enhanced commissioningposted by Vivian Szeto on
Hi, there.Can an employee of the LEED consultant firm who he/she is not a member of the design team be the CxA for both fundamental Cx and Enhanced CxA?
Calculation of Open space
NC-v4 SSc3:Open spaceposted by krishnan v on
I have a leed boundary of 100 acre out of which 40 acre is green field and 60 acre is previously developed.
Examples of Completed (filled up) Templates
posted by Muhammad Riazul Hamid on
This is my first LEED NC project as a LEED Consultant. Could anyone please give the links where I can download examples of previously filled up templates?
Onsite Non-potable Water Reuse Guide is out!
posted by Clark Brockman on
You can download the guide here:
https://www.collaborativedesign.org/
Recessed mats
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Heather Holdridge on
We are considering using a recessed coir walk-off mat for a LEED project. It will be recessed with a stainless border. Does this count as a roll-out mat and would require weekly maintenance?