Forum quick links
Monitoring based Cx independent of Advanced Energy Metering?
NC-v4 EAc1:Enhanced commissioningposted by Joyce Kelly on
Our project is pursuing MBCx but the budget cannot support achievement of all rqmts of Advanced Energy Metering. Can we achieve one without the other?
Database fro CDPH Emission Testing compliant materials
NC-v4 EQc2:Low-emitting materialsposted by Summer Gorder on
Where can I find a database fro CDPH Emission Testing compliant materials?
LEED v4.1, ARC and Minimum Requirement Entries
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Ann Gallogly on
I'm a first time LEED project coordinator using the ARC platform to recertify a Existing Building O+M project.
Tenant lighting savings with local code (T24) requirements
CS-v4 EAp2:Minimum energy performanceposted by Maria Grimm on
Is it possible to claim tenant lighting savings due to local code requirements, without a signed tenant lease agreement?
BUG rating method for adjustable lighting
NC-v4 SSc6:Light pollution reductionposted by Yami Orduna on
Hi,
Soil testing to document restoration
NC-v4 SSc2:Site development - protect or restore habitatposted by Beth Johannessen on
Is a soil test needed both before and AFTER construction to show that soil has been restored? We are tyring to understand how to document the restoration of the soil.
Heat Island Reduction
NC-v4 SSc5:Heat island reductionposted by Marie Bizzak on
I'm wondering if anyone knows what specifically is needed in order to get the Heat Island credit? The project has a 5 story, above ground parking garage without a roof on the top level.
EQpc116 - Daylight in nonregularly occupied spaces
NC-v4 INc1:Innovationposted by Marie Bizzak on
Can anyone please help me understand what is needed for Daylight in nonregularly occupied spaces, option 2?
https://leeduser.buildinggreen.com/credit/Pilot-Credits/EQpc116
Can this credit be deferred on a split review to Construction?
NC-v4.1 EAc5:Renewable Energyposted by Kelsey Wotila on
Hi All,
Pilot-Credits EQpc116: Daylight in nonregularly occupied spaces
NC-v4 INc1:Innovationposted by Marie Bizzak on
To Whom It May Concern,
Can someone please help me understand what is needed for the Daylight in nonregularly occupied spaces, option 2? What is a weather file or geometric plot?