Forum quick links
Renewable Energy - Confirmation of Renewable Attribute Ownership
CS-v4.1 EAc5:Renewable Energyposted by Levi Jimenez on
We have a site with a substantial solar array that is owned by the building owner. The LEED Credit form requires uploaded supporting documentation as follows: "upload confirmation
On site visits required?
NC-v4 EAp1:Fundamental commissioning and verificationposted by Kasandra Martin on
The project I am hired to commission is a day drive. Is it possible to only review the contractors tests or is on site necessary or required?
Industry wide EPD vs. Product Specific EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Caitlin Hutton on
Hello, I am attempting to achieve option one of the MRc2 credit meaning we need a total of 20 products from 5 different manufacturers.
Design Submittal
posted by Aaron Kennedy on
We are finishing up the design submittal to submit for review, but I cannot find where the overall plans are supposed to be submitted? Am I missing it somewhere or Is there not a place to sub
CO2 monitoring in return air ductwork in a behavioral health facility
Healthcare-v4 EQc1:Enhanced indoor air quality strategiesposted by Bethany Beers on
We are currently designing a behavioral health inpatient facility in the Seattle area. Per local codes, demand control ventilation is required and is allowed in the return air ductwork for spaces.
rainwater reuse on site
CS-v4 SSc4:Rainwater managementposted by Alfonzo Farber on
We are working with a building in an urban core area that wants to upsize the stormwater retention tank to capture all rainwater on site. They then plan to use the water for irrigation, cooli
Will Illuminated Sign Eliminate Chance for Achieving SSc6 for Historic Building?
CS-v4.1 SSc6:Light Pollution Reductionposted by Cindy Davis on
I'm working on a buildiing that is on the national historic register.
EV Charging Stations
Healthcare-v4 LTc8:Green vehiclesposted by Dianne Herrin on
Hello - My client is preparing to purchase Tesla EV charging stations to meet LEED v4 requirements. These stations will work only with Teslas.
Equity Plan examples?
CS-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Casey Cullen-Woods on
Hello, I am working on a Core and Shell Office Building that does not mee tthe v4 pathway for this credit.
Lighting coordination with Thermal Comfort
NC-v4 EQc6:Interior lightingposted by Laura strauss on
- Are Janitors Rooms, Storage Rooms, Electrical Rooms, Mechanical Rooms, Elevator Rooms, (not normally occupied rooms) required to conform with controls if listed in the thermal comfort submit