Furniture - Piano and Ping Pong Table?

Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishings
posted by  Lea McRoberts  on 

Where does LEED draw the line on furniture? I have a project w/ a spendy piano and ping pong table, do these count? Thank you, Lea

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Sat Apr 18, 2015, 5:15 am

Open Floor Plan with different Tvis Values

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Marisa Britton  on 

Can I do prescriptive method of calculation for an open floor plan if the N+W glazing walls of the building have a Tvis of 38% and the South + East glazing walls have a Tvis of 56%?

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Apr 16, 2015, 6:24 pm

Future Expansion

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Karl Heitman  on 

Our project, an industrial manufacturing facility, is expecting future expansion, and it has been noted on our permit/construction drawings.

2
Default Avatar
President
Heitman Architects Inc
LEEDuser Premium Member
4 thumbs up
Thu Apr 16, 2015, 4:45 pm

Does CI fit into BD+C?

LEED Rating System Selection
posted by  Sara Greenwood  on 

Hello, I am developing TI Guidelines for unfinished retail space in a building pursuing BD+Cv2009. Can the future tenant pursue CI?

3
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Wed Apr 15, 2015, 10:53 pm

Transitional Entry Atrium Lobby belong in Energy Model?

NC-2009 EAp2:Minimum Energy Performance
posted by  Joyce Kelly  on 

A five story Atrium is being constructed in a science building. It is also the main entry into the building and furnished with benches for transient use.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Apr 14, 2015, 4:55 am

Regularly Occupied Space

EBOM-2009 PIf3:Occupant and Usage Data
posted by  Saul Pichardo, AIA  on 

Hello, Where can I find information on what is considered "regularly occupied space" in a warehouse facility that has most of its space dedicated to product storage and much of the open area used

2
Sat Apr 11, 2015, 3:06 pm

Subtraction of utility's renewable energy sources from RECs?

NC-2009 EAc6:Green power
posted by  Erica Downs  on 

This may be a silly question, but I said I would ask... If we can document that XX% of our client's utility-provided electricity is from renewable sources (wind, hydro, solar), can they just purch

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Apr 9, 2015, 8:06 pm

Partial Purchased Energy

NC-2009 EAp2:Minimum Energy Performance
posted by  Christopher Strunk  on 

Good afternoon. I'm getting started on a model for a county courthouse office expansion. In its pre-renovated state, the facility purchases both HW and CW through the local utility.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Apr 9, 2015, 5:51 pm

FSC Certified Plywood

NC-2009 MRc7:Certified Wood
posted by  Andy Prestridge  on 

I have a lot of plywood that is being used on the job that is supposed to be FSC Certified.

2
Default Avatar
Tahiti Cabinets Inc.
LEEDuser Basic Member
0 thumbs up
Thu Apr 9, 2015, 3:06 pm

Furniture Cost

CI-2009 MRc5:Regional Materials
posted by  Morteza Kasmaei  on 

In a LEED-CI project, can we attempt for MRc4, MRc5, and MRc7 but not included cost of furniture in the calculator? It means that the furniture is not included in any of the LEED-CI credits.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Tue Apr 7, 2015, 11:19 pm