Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Dark underground ballroom and regularly occupied space exception

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Olivier Brouard  on 

Hi everyone, Working on a conference center, we are close to get to Gold Certification by 2 points.

5
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Sat Jan 30, 2016, 1:39 am

Old to be reused equipement

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Kalyan Nishtala  on 

Hi, I am currently working on an office building which is aiming for LEED Silver under CI (2009).

4
Fri Jan 29, 2016, 7:29 pm

Baseline HVAC Systems

NC-2009 EAp2:Minimum Energy Performance
posted by  Khaled Fouda  on 

I am Energy Modeling a highrise new construction in NYC.

3
Design Engineer, LEED AP (BD+C)
Energy Concepts
LEEDuser Basic Member
5 thumbs up
Wed Jan 27, 2016, 3:29 pm

Planting recycled conent

NC-2009 MRc4:Recycled Content
posted by  Thomas Perkins  on 

“Site materials (31.60.00 Foundations, 32.10.00 Paving, 32.30.00 Site Improvements, and 32.90.00 Planting) that are permanently installed can be included in the MR credits.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Jan 27, 2016, 12:04 am

Size of map

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Dave L  on 

I have a project in which I need to “provide a revised map that highlights the existing residential area and density.

2
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Tue Jan 26, 2016, 7:52 pm

Spring and Fall Conditions on the Thermal Comfort Tool

CI-2009 IEQc7.1:Thermal Comfort—Design
posted by  Logan Dorrell  on 

What are we supposed to submit for the "Spring" and "Fall" conditions for the Thermal Comfort Tool for Upload IEQc7.1-2? We have design setpoints for cooling and heating and easily identifiable cl

2
Tue Jan 26, 2016, 6:52 pm

Documenting Donation or Resale of Salvaged Material

NC-2009 MRc2:Construction Waste Management
posted by  Jennifer Preston  on 

Our project involves demolition. There are some materials - wood beams, bricks - that will likely be either donated to a reuse center or sold.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Jan 25, 2016, 7:34 pm

Estimate for Shower Usage with Default Occupancy

CS-2009 WEp1:Water Use Reduction
posted by  Brian Salazar  on 

Hi! I have two Core & Shell projects where the landlord is providing showers and changing rooms. There's a toilet inside the changing room area.

3
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Fri Jan 22, 2016, 3:29 pm

Regional Material

CI-2009 MRc5:Regional Materials
posted by  Susan Niemiec  on 

My company makes steel storage products. We are 90 miles from Gary Indiana where the raw products are smelted and fabricated into coil and sheet steel produced for us.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jan 22, 2016, 3:58 am
5
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Jan 21, 2016, 3:23 pm