Spaces controlled by both daylight and occupancy sensors
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Edgar Arevalo on
I have a project that has spaces which are controlled by both an occupancy sensor and a separate daylight sensor that is installed within 15 feet of the windows.
Definition of "Sourced"?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Douglas Flandro on
The credit language says,"For credit achievement calculation, products sourced (extracted, manufactured, purchased) within 100 miles (160 km) of the project site are valued at 200% of their base co
EAP2 Minimum Energy Performance -- How to classify building
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by cathy keagle on
We have a client that would like to attempt to certify one building that is part of a college campus. This building is primarily instructional classrooms, some office space, and an auditorium.
Loss of points after certification and ramification
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by howard finkel on
One of our recently completed projects obtained Lead Silver and part of the points were based on NC-2009 SSc4.3: and SSC4.4.
Where is form Plf3-1?
NC-2009 PIf3:Occupant and Usage Dataposted by Ileana Schinder on
I'm looking for the form required to comply with "Complex Occupancy" under form PLF3. I have a Rec Center with low full staff occupancy (5) but VERY HIGHT Peak transient occupants (642).
ACP and Regional Priority
NC-2009 RPc1:Regional Priorityposted by Joanna Jenkins on
I suspect I know the answer to this, but I'm wondering if others have any experience with earning Regional Priority points having used an Alternate Compliance Path.
Eye Wash Basins in a Lab
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Aru Sau on
Would a Eye Wash Basin in a Laboratory be considered as Process Water and should not be included in the credit calculation?
LEED Form for Natural Ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Erica Downs on
Does anyone have an example of a LEED Form completed for natural ventilation they would be willing to share? There does not appear to be one in the "documentation toolkit".
FloorScore credit on wall applications
NC-v4 EQc2:Low emitting materialsposted by Rick Farrell on
If a FloorScore certified product, specifically a pre-finished engineered wood floor, is applied to a wall or ceiling application does the product contribute to the EQc2 credit in LEED v.4?
Interchangeability of LE/FE vehicles and HOV parking spaces
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Karl Heitman on
We are pursuing both SS4.3 and SS4.4. As long as we provide the total parking spaces required for both 4.3 AND 4.4, can those spaces be used interchangeably for either LE/FE and HOV?