Natural Ventilation of a Warehouse/Maintenance Building
NC-2009 IEQp1:Minimum IAQ Performanceposted by Phil Stafa on
Has anyone had an issue with complying with ASHRAE 62.1 for natural ventilation of a space that is being used as a maintenance garage? We have 3 garage doors that are open to a large garage type a
Prescriptive Method of Documenting - Floor Area (per bay)
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Michael Haugh on
First off, I have had a very hard time finding information to help complete this Credit's documentation.
Master site credits
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by charles bell on
We have three projects on a campus application. The master site submittal for this credit as well as others was approved during review.
Refurbishing of historic windows
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Kath Williams on
Windows in our historic building project have been removed, refurbished, glass upgraded to double-pane, low-e, etc. Can we use frames under MR c1 Building Reuse and MR c5 Regional Materials?
LEED EQ 4.2 Wallpaper Compliance
posted by Saahiti Penigalapati on
One of the credits we are attempting on a LEED project is the EQ 4.2 (Low Emitting Materials-Paints and coatings).
Wedding Hall with Dance space Design for Credit 7.1 & 7.2
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Lew Bonadies on
We wish to pursue the credits IEQ 7.1 & 7.2 , the space is auditorium seating with a dance floor for Wedding .(Area - 5300 sq ft , Occupancy 370 People), having office spaces on other floors .
RE: SSc5.1: It looks like a greenfield site but may not be???
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Joe Manganelli on
Hi All, I am working on a 200 acre site that looks like greenfield farmland.
Campus project (Master site) with 4 buildings
NC-2009 EAc2:On-Site Renewable Energyposted by Peg Manuel on
We have a campus project with 4 buildings. The client expects LEED Gold for all 4 buildings. LEED Design Review is complete, LEED Construction review has not begun.
Free Address vs. Full Flexibility
posted by Carina Clark on
WELL's Intent for feature 82 Individual Thermal Comfort is: To maximize and personalize thermal comfort among all occupants.
Pilot vs v4 Demand Response - Full Automation
Pilot-Credits EApc8:Demand responseposted by Jennifer Wehling on
I have a LEED NC 2009 project that wants to use Demand Response as an Innovation Point.