Packaging?
NC-2009 MRc4:Recycled Contentposted by Caroline O'Leary on
Here's one I haven't seen and would love for people to weigh in on. A manufacturer of, let's say paint, has provided recycled content information but it's for the buckets their product comes in.
Copy area in office - acoustical treatment
CI-v4 EQc9:Acoustic performanceposted by Leticia SooHoo on
Hi, we are designing an office space which will have a copy area ( 2 to 3 floor model copiers) adjacent to an open office space.
Existing HVAC system efficiency
CI-v4 EAp2:Minimum energy performanceposted by Richard Mathews on
Let's say I'm doing a tenant job in an existing office building, and the tenant is served by an existing rooftop AC unit.
Different equipment types or all equipment units in scope
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Edgar Arevalo on
For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled.
FTE calculations and bicycle parking
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Nicholas Klever on
I am working on certifying an addition to a military readiness center which operates drill weekends so the facility occupants greatly increases for 2 those 2 days each month.
Diverse Uses within a Shopping Center
CS-v4 LTc4:Surrounding density and diverse usesposted by Frank Sherman on
The planned C+S development is a shopping center that will include retail, restaurants, a grocery store and movie theater.
LEED Online Form Help for Process Water
Retail-CI-v2009 WEp1:Water use reductionposted by Sara Zoumbaris on
Hello, I have a project with three pieces of process water equipment and I have a few questions about the form. 1.
Pursing credit in an existing building
Pilot-Credits EQpc78:Design for active occupantsposted by Dee Spiro on
Our project involves renovating an existing building on a university campus.
Required to use facility weighted average?
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Eileen Gohr on
"Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials to the facility." Does this mean that proje
Integrative Pilot Credit - Design or Construction Credit
Pilot-Credits PC60:Integrative Processposted by Devki Wright on
Hi there - when submitting the documentation for this credit, is this considered a design or construction credit?