Forum quick links
Cold Climate
NC-2009 SSc7.1:Heat island effect - nonroofposted by Erin Holdenried on
Does anybody have experience using an alternate compliance path for a project in a cold climate?
Volume Captured on the Stormwater Mgmt Calculator
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Kimberlee Dobbins on
Going from LEED-EB 2.0 SS credit 5.1 to LEED 2009, O&M, what is the number for "Volume Captured"?
Documentation
Healthcare-v4 MRp3:PBT source reduction - mercuryposted by David Dixon on
Working on a v2009 BD+C project and using the credit as an ID credit looking for information on accepted documentation. Any insight will be helpful
aerosol line saver (also posted in IEQc4.1)
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Lyle Axelarris on
I also posted this in IEQc4.1 since I do not know where, if anywhere, this product would go: Has anyone considered reporting the use of aerosol "line saver"?
How is an area/square footage assigned to a tree?
NC-2009 WEc1:Water efficient landscapingposted by Tricia Loe on
I have a plaza with 32 trees, with each in their own tree grate. I am trying to determine how to input this vegetation type into the EPA WaterSense calculator.
Envelop Commissioning
CI-v4 EAp1:Fundamental commissioning and verificationposted by Peter Doo on
The LEED Online template provides selections for HVAC systems commissioning (4pts) or commissioning with monitoring (5pts). The LEED Reference Guide describes Enhanced Systems Commissioning (3-4pts
Substantial Completion, C of O, TCO
posted by Erika Duran on
Per the LEED certification Policy – we can submit construction review at Substantial Completion (defined as the date on which the building receives a Certificate of Occupancy or similar official in
FSC Wood COC
NC-2009 MRc7:Certified woodposted by Andy Prestridge on
We have received the FSC invoice for some of our FSC plywood and our subcontractor had it delivered to his shop a few miles away and then brought it to the site.
Combination Shower/Bathtub in Dormitory
CI-2009 WEp1:Water use reductionposted by Vicki Rybl on
Hi All, I am working on a project which is a dormitory. Each living unit has a bathroom which, along with a toilet and sink, contains a combination shower/bathtub.
Exception to Vestibules in ASHRAE?
NC-2009 EAp2:Minimum energy performanceposted by Sara Greenwood on
Hello, I am working on a project in Climate Zone 4 and was wondering if there is any guidance that pertains to buildings with entries that open to a ventilated parking structure which would allow u