Multi-Purpose Latex Primer/Sealer

Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Stephanie Santiago  on 

What voc limit would I use for a Multi-Purpose Latex Primer/Sealer paint for use on interior ladders?

1
Sun Oct 5, 2014, 2:09 pm

WEc1 - We don't really have a "SITE" outside of the building env

Retail-NC-v2009 WEc1:Water efficient landscaping
posted by  Lou Niles II  on 

Hello I am working on Two Separate projects that actually overlap on a site; they are not registered as Master Site or Campus and we don't want that at this time. Project A Surrounds Projects B. Pr

1
Sat Aug 26, 2017, 11:54 pm

Atypical Fixture on a Floor with 0 FTE

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Alexis Thompson  on 

I'd like some assistance on defining my fixture groups. My project has the same public lavs, water closets, and urinal fixtures throughout the building with very similar occupant usage patterns.

0

USGBC Approved Environmental Product Declaration Framework

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Gary Brock  on 

It still isn't clear to me what is meant by "USGBC approved environmental product declaration framework" which is applicable for pursuing either option 1 or option 2.

1
Fri Jul 22, 2016, 10:03 pm

Exterior Lighting Baseline vs Proposed

NC-2009 EAp2:Minimum Energy Performance
posted by  Maria Unruh  on 

I'm trying to understand baseline exterior lighting versus the proposed. My calculations show that my proposed is less than my baseline, is this okay?

1
Tue May 26, 2015, 7:42 pm

Temporary potable connection to a permanent irrigation system

Schools-2009 WEc1:Water Efficient Landscaping
posted by  Bradley Smith  on 

I have a LEED Campus project, using permanent irrigation systems fed by rainwater collected in cisterns and pumped. Approx.

1
Sun Aug 27, 2017, 12:48 am

Building Envelope Commissioning

Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelope
posted by  Lance Barron  on 

We are working with a client who would like to get LEED credit for building envelope commissioning, but which has not pursued enhanced commissioning.

1
Sat Aug 26, 2017, 11:45 pm
1
Fri Jan 9, 2015, 9:52 pm

Heat pump water heater

CS-v4 EAc6:Enhanced refrigerant management
posted by  Ammon Palmer  on 

We are using a heat pump type water heater. The refrigerant capacity for the unit is over the 0.5 lb threshold.

1
Thu Jun 2, 2016, 10:43 pm

Using pre-existing conditions as oppposed to existing conditions

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Mei Zhu  on 

SS C6.1 has two cases: Case 1: Sites with existing imperviousness 50% or less: Requires proposed runoff not exceeding the existing runoff. Case 2: Sites with existing imperviousness greater than 50

1
Wed Jul 27, 2016, 7:36 pm