LEED Ergonomic Credit

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Katie Cervenec  on 

Does anyone have any tips for getting the building occupants excited about participating in the ergonomic credit and learning about their new ergonomic features in their building?

1
Wed Dec 30, 2015, 10:45 pm
1
Mon Jun 15, 2015, 7:17 pm

EBOM SSc2: policy vs practice for snow removal

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Drew DePalma  on 

Hi, I have read in this forum that if no deicer is applied during a performance period that a project would be in compliance with that element of the SSc2 credit requirements.

1
Fri Oct 9, 2015, 10:07 pm

Commercial Coffee Brewers

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Donald Green  on 

Under the Energy Star Partner Program there is a listing for Commercial Coffee Brewers V1.0 as of 7/2016 - however when you go to the Find Products there is NO listing for Commercial Coffee Brewers

1
Tue Feb 14, 2017, 3:34 pm

RE: Would we exclude interior walls that were never permitted?

NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Diane Hale CHMM, CDGP, CEM, CESCO  on 

We have an existing older building that had interior walls and sectioned rooms put in that were never permitted and were not code compliant.

1
Mon May 1, 2017, 4:00 pm

Making the Shipping Company Take the Packaging?

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Kimberlee Dobbins  on 

I know I read about a company doing this, but I can not seem to find who it was, or how it was done.

1
Thu Dec 11, 2014, 6:36 pm

Resinous Flooring

CI-v4 EQc2:Low emitting materials
posted by  Marcia Weekes  on 

Would resinous flooring be evaluated under the Flooring or Paints & Coatings category?

1
Sun Aug 27, 2017, 12:33 pm

CxA for Enhanced

CI-v4 EAc1:Enhanced commissioning
posted by  Tony Haschke  on 

The project is under 20,000 sq. ft and only a tenant finish in an existing building. Can the CxA be an employee of the design firm for the enhanced Cx?

1
Fri Jun 24, 2016, 5:06 pm

Pressure drop adjustment factor with DOAS System

CS-2009 EAc1:Optimize Energy Performance
posted by  Curtis Clark  on 

In the proposed model, we have a HEPA 13 filter in a dedicated outdoor air unit which serves a variable refrigerant flow system.

1
Thu Apr 9, 2015, 2:51 pm