SSpc14 Walkable Project Sites - navigating process
Pilot-Credits PC14:Walkable Streetsposted by Margaret Montgomery on
Wow. The credit makes some sense, but the process is definitely a challenge. I just spent 20 minutes trying to find the survey to complete it.
BTU Metering for Existing HVAC
CI-2009 EAc3:Measurement and Verificationposted by Jareb Ketay on
I have a tenant renovation project occupying 1 story of an existing 10 story building (
energy savings for tenant vs Materials & Resources credits
CS-2009 EAp2:Minimum Energy Performanceposted by Richard Mathews on
We designed the Core & Shell of this building as one project - and subsequently also designed most of the tenant occupancies, so we know that there are savings in the lighting for the various t
Local Ordinance prompts pkg improvements outside LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Alicia Ponce on
Our project is an Addition that will sit North of an existing school. Our LEED project scope does not include the existing building nor the existing parking lot to the south.
No Mow Grass
Schools-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Cynthia Kaplan on
My Massachusetts school project is restoring a large area and considering No Mow grass. Will this be considered as a monoculture like turf grass, or a meadow?
Project using EApc67 for Minimum and Optimize Energy Performance
Pilot-Credits EApc67:Energy Jumpstartposted by Greg Romanczyk on
We've registered for EApc67 for our LEED O+Mv4 project.
PI Form4 - Lease Requirement
CI-2009 PIf4:Schedule and Overview Documentsposted by Ludmilla Pavlova-Gillham on
My University (12M GSF, 13 divisions, 54 major business units, over 250 major departments), has a multi-use building (287,000) that is undergoing a commercial retail renovation on the ground floor
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
tenant requirements to maintain compliance with IEQc8.1 and 8.2
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Gail Napell on
Has anyone had comment from GBCI when taking these credits for a speculative C&S office building? We provide a proposed tenant layout that shows the interior complying with these credits.
shuttle bus to rail station
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Gail Napell on
we have a project with the main entrance 0.3 miles from 4 public shuttle bus stops that provide express connections to a commuter (and regional, and national!) railway station.