LEED HC (major renovation) or CI (v4)?

LEED Rating System Selection
posted by  Heather Zeto  on 

I have a project that is undergoing discussion regarding which rating system to use. For all practical purposes, it is an interior fit-out of 4 floors of a hospital tower for a new unit.

1
Sat Aug 26, 2017, 7:32 pm

ammonia-based fertilizers

Schools-EBOM-v4 SSc5:Site management
posted by  R. Ted Krasnesky  on 

Can fertilizers contain a small percentage of Ammoniacal Nitrogen and still be considered non-ammonia based?

0

Can the credit be use within the Campus Approach

Pilot-Credits IPpc90:Social equity within the operations and maintenance staff
posted by  Luis Huertas  on 

Can this credit be used at a campus, if all the buildings are being built at the same time within the same Master Site?

1
Fri Mar 31, 2017, 7:06 pm

Non regulated items (residential light & receptacle loads)

NC-2009 EAp2:Minimum Energy Performance
posted by  Abena Darden  on 

We are looking at an energy model report for a Residential tower. The project was initially achieving 12% savings.

1
Sat Oct 4, 2014, 9:01 pm

Submitting for a CIR or LEED Interpretation

General forums
posted by  Deborah Lucking  on 

We understand that the only way to submit for a CIR is through the registered project LEED Online platform.

0

LEEDv4 Homes - Parking Structure

Homes-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sara Greenwood  on 

It does not appear that parking structures are required to be included in the LEED-H boundary, however if the structure is being built to service a student housing building and energy modeling incl

1
Tue Jun 20, 2017, 3:11 pm

"Conditioned Space?" - Free cooling with outside air

NC-2009 EAp2:Minimum Energy Performance
posted by  Victoria Watson  on 

Hi, I am not sure whether to class mechanical rooms which are free cooled by outside air as "conditioned" for the purpose of the baseline (so the baseline would be on system 5 in this example).

1
Mon Dec 22, 2014, 3:40 pm

initial fit-out vs alteration?

Retail-CI-v2009 PIf2:Project Summary Details
posted by  Andrew Bennett  on 

What is the difference between initial fit-out and alteration square footages?

0

Requirement 7 - Windows in the Stairs

Pilot-Credits EQpc78:Design for active occupants
posted by  Douglas Flandro  on 

Do the windows in the stairways need to be 8 square feet at each level? I have a 3 story stairwell with a narrow window that runs the length of the stairs. It is 19 feet by 1 foot.

1
Thu Oct 27, 2016, 11:46 am

Future Fit-Out Space & Transients - Table Plf3-3 or Table Pfl3-4

Healthcare-v2009 PIf3:Occupant and Usage Data
posted by  Catherine Blakemore  on 

My project is an addition with on future being future fit-out space.

0