Forum quick links
Commercial Refrigeration Systems
EBOM-v4 EAc8:Enhanced refrigerant managementposted by Meier Corporate Account on
I would like some clarification on what LEED considers a commercial refrigeration system in regards to leak check reports. I have 2 different systems in my plant...
MR c7 forms
NC-2009 MRc7:Certified woodposted by Mark Ramsey on
As a millwork subcontractor with a FSC COC number where can we go to get detailed information on how and what is required to fill out the MRc7 forms.
Double Ridership - access to transit station
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Erin Holdenried on
If a bus servicing your LEED project connects to a bus transfer station (within 2 miles/10 min) of the project site.
Meter for Water Use in Laundry
Healthcare-v2009 WEc2:Water use reduction - measurement and verificationposted by Jon Penndorf on
Does the requirement to meter water used for laundry apply to all type of laundry equipment. For example would is apply to a residential type washing machine or only commercial grade? Thanks
Does gravel count?
NC-v4 SSc3:Open spaceposted by Harvard University Green Building Services on
Does gravel count as vegetated open space where there are bushes and other plantings in the gravel area?
How to use combination of Option 1 and Option 2?
NC-2009 MRc5:Regional materialsposted by Erica Downs on
In the FAQ section above, it says "The two options are available to be used on the basis of an individual product or material, so you can mix and match as needed." Does anyone know how to do this?
DES Option 1 - Baseline System
NC-v4 EAp2:Minimum energy performanceposted by Jay patel on
I am modeling a new building(Laboratory/office) on a university campus following LEED v4 Option 1, Whole Building Energy Simulation. New Building is 3 story and 69,500 sq.ft .
Monitoring Period
Pilot-Credits EApc65:Monitoring based commissioningposted by Mari Hamasaki on
What is the required monitoring period for this credit?
Master's Research Survey
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.
M&V Option 3 for Building Additions
NC-2009 EAc5:Measurement and verificationposted by Mark Zoeteman on
If a LEED project boundary only includes a building addition, would the Addition natural gas, electricity and water utilities need to be separately submetered if fed from main building utility serv