Historic Building Major Renovation - compliance with prescriptive Insulation and Air Barrier Requirements
Mid-Rise-v4 EAp1:Minimum energy performanceposted by Colin Rohlfing on
Hello, there is a 160,000 SF historic building that will be doing a gut-rehab and has a masonry (brick) exterior that can't be altered.
Measuring TVOCs
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Rick Alfandre on
Has anyone ever used a device called the Airthings Wave Plus? We want to use it to report CO2 and TVOC numbers, but it reports TVOC's in ppb not ug/m3.
Purchasing - Lamps: EXIT signs
NC-v4 INc1:Innovationposted by Edgar Arevalo on
I'm having trouble finding lumens for EXIT signs that are to be included in the Lamp Purchasing calculator. Pretty much EXIT sign cutsheets do not show lumens because these are EXIT signs and
Case 2 Demand Response Capable Building with a "future" program
NC-v4.1 EAc4:Grid Harmonizationposted by Chris Flint Chatto on
Is case 2 only available to projects with utilities that don't have DR programs? under v4.0, this was clearly the case ("Case 2.
Arbitrage option
CS-v4 EAc5:Renewable energy productionposted by Beth Brownlie on
When using the "arbitrage" option, is there a limit regarding where, geographically, the replacement RECs can be purchased form?
Receptacles in multifamily midrise building
Pilot-Credits SSpc129:Comprehensive Compostingposted by Emma McKay on
Hi all,
LEED v5 for existing building cleaning standards
posted by Jim Wallace on
My name is Jim Wallace, and I am a COO for the professional cleaning industry based in Detroit.
Green Cleaning
posted by Dana Perry on
My name Dana Perry and my comments represent New Image Building Services, a facility service provider regarding the Proposed LEED O+M: Existing Buildings v5 draft.
BABA (Build America Buy America) + LEED
posted by Linnea Morgan on
How will federal funded buildings required to meet domestic content BABA requirements overlap with LEED?
What if Question - Bathroom removed from scope, how to comply with WEp1?
CI-v4 WEp1:Indoor water use reductionposted by Edgar Arevalo on
How would a project comply with WEp1 if the bathroom was removed from scope. This is a interior fit out of part of a floor, and the common restrooms shared by the project space and the rest o