Non-default Daily Use Values
Healthcare-v2009 WEp1:Water use reductionposted by Christie Morris-Withers on
What is non-default daily use values of water usage? How do I estimate them. This is required to be uploaded for the LEED-online WEp1. Thank you in advance for your help
University Dorm with Designated Parking
NC-v4 LTc7:Reduced parking footprintposted by Heather Zeto on
I am working on a project located on a University Campus. The building usage/type is most closely related to a dormitory.
Is there a minimum % of new floors, walls, ceilings, etc. for a major renovation of an existing building under NC-v4?
NC-v4 MPR3:Must comply with project size requirementsposted by Craig Wilson on
Is there a minimum % of new floors, walls, ceilings, etc. for a major renovation of an existing building under NC-v4? We are trying to decide between O+M and NC for a major renovation.
MR Credit - 20% of WHAT number for the cutsheets
NC-2009 MRc4:Recycled contentposted by Denise Domino on
What are going off of for the 20%? 20% Material Cost???
SSc1 Path 12: EV Charging Stations
CI-2009 SSc1:Site selectionposted by Alaina Ladner on
How many EV charging stations are required to be provided to achieve this credit?
Thermal Comfort for Renovation of Historically Significant Building
NC-v4 EQc5:Thermal comfortposted by Heather Zeto on
Our project is a "Major Renovation" project for a historically significant buidling within a historic district.
V2. LEED Recertification
posted by Jason Zielsdorf on
I have a project that recieved LEED BD+C: New Construction v2 - LEED 2.2 in 2014. They recieved a credit for water reduction with low flow toilets.
Site calculations for single building part of a larger complex
NC-v4 SSc2:Site development - protect or restore habitatposted by MICHAEL LOPEZ on
We have a five-acre site with multiple buildings. However, we are pursuing certification for only one of the buildings. Does the entire site have to meet the prerequisite?
EA-p2: EnergyStar TargetFinder Score
CI-v4 EAp2:Minimum energy performanceposted by Nikhilesh Srinivasan on
My project is an office tenant fitout (1 floor in a high-rise building).
Credit 3.2 option 2
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Michael Schrantz on
To whoever can help me! I am bidding on a two-story building.