Forum quick links
Project has shuttle to train station
NC-v4 LTc5:Access to quality transitposted by Lou Niles II on
The train station is just about 1mile from the projectHello I have a project in California with multiple shuttles that run short routes in the area of this NC building.
High Density Filing Systems
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Jason Cocek on
Does anyone know how high density filing systems fit into the IEQ credits for CI if at all?
Single-zone, multiple systems
CS-2009 IEQp1:Minimum IAQ Performanceposted by Nate Steeber on
Hey all,
I'm sorry if this is a repeat, I tried to search for this specific issue in the forum, and cannot find anything.
Farm on Roof
CI-2009 SSc1:Site Selectionposted by Kristopher Croghan on
Our client currently has no landscape to maintain on site as this is a city office building. However, a roof farm is being considered.
EQ credit 2- Low emiting materials.
CI-v4 EQc2:Low emitting materialsposted by Tracy Backus on
EQ Credit 2: Low-emitting materials Furniture evaluation.
Library: number of spaces and type of markings for Car/Vanpool or Fuel Efficient Vehicles
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Fletcher Bruegger on
We are rennovating the interior only of a public library, no new parking is being added as part of this project, however, we are hoping to qualify for the 3.3 credits. Two questions:
Can sanitation maintenance garage apply as a warehouse?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Edgar Arevalo on
I ask because according to the LEED v4 reference guide, garage spaces in warehouses and distribution centers are no required to install permanent entryway systems at the doors from the exterior to
Bio-based products / USDA BioPreferred designation
EBOM-v4 MRc4:Solid waste management - ongoingposted by Sarah Martinez on
Would a product that is recognized by the USDA BioPreferred program contribute to the 60% threshold for on-going purchases of environmentally preferable products?
Location of car/vanpools for project with perimeter parking strategy
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Sandy Mendler on
Our project has a total of 139 parking spaces at the perimeter of the campus, with ONLY ADA/handicap and six (6) short-term visitor spaces at a close in drop off area.
Bikes & Showers for Multiple Buildings
CS-v4 LTc6:Bicycle facilitiesposted by Sanyog Rathod on
We have three Core & Shell Buildings on one site. They are pursuing seperate certifications, and because of the small size of the projects, we are not doing a campus or group certification.