NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Vanessa Nelson  on 

Will a Greencircle certified flooring product meet the requirements?

1
Fri Jan 12, 2018, 3:58 pm

Demand Response Program available but building can't meet requirements

NC-v4 EAc4:Demand response
posted by  Jason Garvens  on 

Can a project still be eligible to apply for the single point for Case 2 if the project's utility does offer a DR program but the project doesn't sign up for it due to the requi

1
Thu Jan 11, 2018, 6:04 pm

Management of on site runoff at a neighboring retention pond

NC-v4 SSc4:Rainwater management
posted by  Jason Garvens  on 

I'm working on a project being built in a designated industrial park area.

1
Thu Jan 11, 2018, 6:49 pm

Externally illuminated building signage

NC-v4 SSc6:Light pollution reduction
posted by  Gordon Wong  on 

I have a project in Auburn, CA for the California Conservation Corp.  The new building will have a stem mounted luminaire that will illuminate the building name.  Since this luminiar

3
Thu Jan 11, 2018, 2:04 pm

Using a weighted average to document exemplary performance

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Sara Goenner Curlee  on 

The hardscape for my project is mostly white concrete. However, in some areas the white concrete is edged by colored concrete which has SRI values outside the allowable range.

5
Sustainability Project Manager
Atkins
LEEDuser Basic Member
59 thumbs up
Tue Jan 9, 2018, 3:48 pm

LEED EB O+M for just a single Office space in a building

LEED Rating System Selection
posted by  Robert Fernandez  on 

Is it possible to do a LEED EB O+M certification for a 5000 sq. ft. office within a 350,000 sq. ft building.

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Mon Jan 8, 2018, 5:09 pm

partial credit?

CI-v4 IPc1:Integrative process
posted by  Dana Piper  on 

If the tenant is remodeling existing space or the move location is predetermined, is it possible to get 1 of 2 points if we start in pre-design and look at energy and plumbing systems?

12
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Mon Jan 8, 2018, 2:16 pm

30% female 70% male for Police facility FTE

NC-v4 MPR3:Must comply with project size requirements
posted by  Lawrence Lile  on 

We are working on a police facility under LEED V4.  Currently the department is 12% female.  Nationally, police departments, according to a study we will cite, are 14% female.  We ar

3
Chief Engineer
Lile Engineering, LLC
LEEDuser Basic Member
59 thumbs up
Sun Jan 7, 2018, 8:02 pm

Switching from Appendix A to Table 6-3 to calculate Ev

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Edgar Arevalo  on 

I am using an old 62MZ calculator file to do comply with the IEQp1 prerequisite.  However, after adjusting the ventilation rates for peak heating mode, Ev cannot be calculated on the spreadshe

1
Mon Jan 8, 2018, 3:39 am

Variable Kitchen Exhaust

Retail-NC-v2009 EAp2:Minimum energy performance
posted by  Nick Dalton  on 

This project will include kitchen hoods with temperature sensors used to control the volume of exhaust air.

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Fri Jan 5, 2018, 8:21 pm