NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Vanessa Nelson on
Will a Greencircle certified flooring product meet the requirements?
Demand Response Program available but building can't meet requirements
NC-v4 EAc4:Demand responseposted by Jason Garvens on
Can a project still be eligible to apply for the single point for Case 2 if the project's utility does offer a DR program but the project doesn't sign up for it due to the requi
Management of on site runoff at a neighboring retention pond
NC-v4 SSc4:Rainwater managementposted by Jason Garvens on
I'm working on a project being built in a designated industrial park area.
Externally illuminated building signage
NC-v4 SSc6:Light pollution reductionposted by Gordon Wong on
I have a project in Auburn, CA for the California Conservation Corp. The new building will have a stem mounted luminaire that will illuminate the building name. Since this luminiar
Using a weighted average to document exemplary performance
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Sara Goenner Curlee on
The hardscape for my project is mostly white concrete. However, in some areas the white concrete is edged by colored concrete which has SRI values outside the allowable range.
LEED EB O+M for just a single Office space in a building
posted by Robert Fernandez on
Is it possible to do a LEED EB O+M certification for a 5000 sq. ft. office within a 350,000 sq. ft building.
partial credit?
CI-v4 IPc1:Integrative processposted by Dana Piper on
If the tenant is remodeling existing space or the move location is predetermined, is it possible to get 1 of 2 points if we start in pre-design and look at energy and plumbing systems?
30% female 70% male for Police facility FTE
NC-v4 MPR3:Must comply with project size requirementsposted by Lawrence Lile on
We are working on a police facility under LEED V4. Currently the department is 12% female. Nationally, police departments, according to a study we will cite, are 14% female. We ar
Switching from Appendix A to Table 6-3 to calculate Ev
CI-2009 IEQp1:Minimum IAQ Performanceposted by Edgar Arevalo on
I am using an old 62MZ calculator file to do comply with the IEQp1 prerequisite. However, after adjusting the ventilation rates for peak heating mode, Ev cannot be calculated on the spreadshe
Variable Kitchen Exhaust
Retail-NC-v2009 EAp2:Minimum energy performanceposted by Nick Dalton on
This project will include kitchen hoods with temperature sensors used to control the volume of exhaust air.