RE: Not Venting Copy Rooms Because of ASHRAE Interpretation IC 62.1-2007-25
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Joe Manganelli on
Hey All,
Historic Building Energy Performance with Regard to Insulation
NC-v4 EAp2:Minimum energy performanceposted by Sara Greenwood on
Hello,
Getting Started
NC-v4 MRc1:Building life-cycle impact reductionposted by Mike Workman on
Hi All, Our building we are working on is not existing and will be built new on the site. Do we still qualify for Mrc1 option 4?
Schools: Shop-applied primers
Schools-NC-v4 EQc2:Low emitting materialsposted by Philip Kabza on
Previous restrictions on content of shop-applied primers (such as on structural steel), that were put on hold in v3, appear to not have carried forward at all in v4. Am I correct?
When to perform the waste audit?
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Summer Minchew on
LEEDuser guidance clearly states that the waste audit should be performed during the Performance period.
glass paint & SCAQMD Rule #?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Debra a. Lombard on
Hi, we are a GC on a LEED NCv2009 project & need to paint some interior glass. I'm trying to confirm the VOCs the paint/coating needs to comply with.
Reviewers are not paying attention
NC-v4 SSc6:Light pollution reductionposted by Bill Swanson on
Just got the review comments back on a project.
For Uplight, Option #1 was selected. BUG rating of fixtures was provided.
Average Weekend Trips
NC-v4 LTc5:Access to quality transitposted by Brendan Isard on
We have a project which a bus line provides (15) trips on a Saturday and (11) trips on a Sunday, with an average of (13) trips between the (2) days. The credit language states that an average
Utility Bills for REC Green Power Calculations...
NC-2009 EAc6:Green powerposted by Rick Alfandre on
The link below, fromLEEDuser, indicates that if you can use actual utility bills x 50% x 2 yrs to calculate the required quantity of RECs as opposed to the EAc1 energy model design consumption x 35
Amtrak and Megabus
NC-v4 LTc5:Access to quality transitposted by Sara Zoumbaris on
Our project is shy of the second weekend trip threshold (108) by 1-ride. We are within walking distance of Amtrak, which has regularly scheduled pickups at our location twice a day.