Forum quick links
Residence Hall 24 hour Use Spaces
NC-2009 SSc8:Light Pollution Reductionposted by Lisa Ferreira on
We have designed a residence hall that has single and double rooms on a double loaded corridor, with shared floor lounges and studies.
Preferred Parking Enforcement Requirements.
NC-v4 LTc8:Green vehiclesposted by Chris Brown on
Regarding the preferred parking, the credit requrements state "Clearly identify and enforce for sole use by green vehicles." (emphasis added).
Grid interactive charging stations
NC-v4 LTc8:Green vehiclesposted by Lawrence Lile on
- USGBC requires that electrical connectors must adhere to SAE Surface Vehicle Recommended Practice J1772, SAE Electric Vehicle Conductive Charge Coupler or an equivalent regional or local sta
BE CxA - Rules and Regulations? Who can do it?
Retail-NC-v4 EAc1:Enhanced commissioningposted by Brian Salazar on
Do the same restrictive rules apply to the Building Envelope CxA as they do to the MEP CxA? I don't see any detail about this on the USGBC site.
Preserve and protect from all development and construction activity 40% of the greenfield area on the site
NC-v4 SSc2:Site development - protect or restore habitatposted by Jason Garvens on
I'm hoping someone can make this requirement interpretation crystal clear for me as I'm struggling to fully grasp what it mean.
Modeling Mechanical Systems for Core Areas
CS-v4 EAp2:Minimum energy performanceposted by Chris Hammett on
I am working on a project that includes some limited core areas such as lobby, electrical rooms, restrooms, etc. and spaces allocated for future tenants.
Recharging Stations - Off-site parking
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Jay Murray on
This project is a new 33 story hotel/condo in Boston. There is no parking garage in the building.
RE: Not Venting Copy Rooms Because of ASHRAE Interpretation IC 62.1-2007-25
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Joe Manganelli on
Hey All,
Historic Building Energy Performance with Regard to Insulation
NC-v4 EAp2:Minimum energy performanceposted by Sara Greenwood on
Hello,
Getting Started
NC-v4 MRc1:Building life-cycle impact reductionposted by Mike Workman on
Hi All, Our building we are working on is not existing and will be built new on the site. Do we still qualify for Mrc1 option 4?