Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Reclaimed water use

NC-v4 WEc1:Outdoor water use reduction
posted by  Ann Runley Carroll  on 

If I am using all reclaimed/recycled water, do I still need to use the calculator. Where do I download the calculator? By using reclaimed/recycled water, do I get 2 points?

4
Mr
Green Building Council Georgia
LEEDuser Basic Member
3 thumbs up
Tue Mar 13, 2018, 11:41 am

Brick and rubble in soil

NC-v4 MRc5:Construction and demolition waste management
posted by  Marilyn Specht  on 

We are working on a LEED v4 project in an urban core. We are targeting 2 points for MRc5 and have an aggressive Construction & Demolition Waste Management Plan underway.

 

3
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Mon Mar 12, 2018, 5:59 pm

Greenfield

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Lene Hill  on 

The site is about 47 acres of woods and meadow. It was at one time part of an estate and had a home, garden etc on it.  This is where the new site is going.

1
Mon Mar 12, 2018, 6:14 pm

How does this Pilot Credit work?

Pilot-Credits EQpc85:Learning Controls for Thermal Comfort
posted by  Shannon Brown  on 

I have no experience with this pilot program, so naturally I'll have a couple questions rather than comments.

0

How to Model unit heater in Basel & Proposed model following 90.1-2010?

Mid-Rise-v4 EAp2:Energy metering
posted by  soham babu  on 

In my Proposed model(Design) I have DOAS with gas heating, VRF Fan coil units & Electric Unit heaters. following ASHRAE-90.1-2010,

1
Tue Jan 22, 2019, 8:00 am

Two Phase Renovation - Two phases of testing possible?

CI-v4 EQc4:Indoor air quality assessment
posted by  Katherine Roth  on 

The commercial interiors project includes the renovation of an office space in two phases. 1/2 of the tenant space will be renovated in Phase I.

0
5
Default Avatar
President
Genesis Design Inc
LEEDuser Basic Member
7 thumbs up
Thu Mar 8, 2018, 1:15 pm

EAp2

CI-2009 EAp2:Minimum Energy Performance
posted by  Steve Zuwala  on 

When listing non-energy star equipment we enter N/A in the Make or model column. This column is also used for Equivalent equipment as well, so the right had part of the form serves two purposes?

3
Wed Mar 7, 2018, 11:16 pm