Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Two Phase Renovation - Two phases of testing possible?

CI-v4 EQc4:Indoor air quality assessment
posted by  Katherine Roth  on 

The commercial interiors project includes the renovation of an office space in two phases. 1/2 of the tenant space will be renovated in Phase I.

0
5
Default Avatar
President
Genesis Design Inc
LEEDuser Basic Member
7 thumbs up
Thu Mar 8, 2018, 1:15 pm

EAp2

CI-2009 EAp2:Minimum Energy Performance
posted by  Steve Zuwala  on 

When listing non-energy star equipment we enter N/A in the Make or model column. This column is also used for Equivalent equipment as well, so the right had part of the form serves two purposes?

3
Wed Mar 7, 2018, 11:16 pm

Biobased materials - Manufacturer declared conformance

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Danna Richey  on 

We have a project on which we're using a large amount of wool, and we'd like to be able to take credit for biobased materials.  Since we're unable to find any

0

End use with multiple fuels

Retail-CI-v4 EAc3:Advanced energy metering
posted by  Jared Silliker  on 

I'm working on a grocery project. Cooking will be a significant energy load, exceeding 10%, and will be gas-dominant.

0

Interior Lighting Controls - Daylighting Controls

CI-v4 EAc2:Optimize energy performance
posted by  Michael Archer  on 

The credit states the following: Install daylight-responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under skylights for at least 25% of

1
Wed Mar 7, 2018, 11:08 pm

Demolition includes Mechanical and Electrical equipment

NC-v4 MRc5:Construction and demolition waste management
posted by  Jeff Ross-Bain, PE, LEED Fellow, WELL AP  on 

Assume a building to be demolished has large HVAC equipment and electrical gear, etc., and is not being reused but discarded.

1
Tue Mar 6, 2018, 3:16 pm

Assessment Influence on Design

NC-v4 SSc1:Site assessment
posted by  Summer Minchew  on 

My question ties back to the FAQ response: "The credit requires that projects assess each feature, but it does not require that every assessment influence the project design." This credit was denie

1
Wed Jan 2, 2019, 6:35 pm

20% of occupants vs. 20% of occupants

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Cindy Quinn  on 

The credit language says  "Agree to develop a plan for corrective action if the survey results indicate that more than 20% of occupants are dissatisfied", while the LEEDuser's viewpoi

1
Sun Mar 4, 2018, 1:03 pm