My project is a split submittal, with a Design Preliminary Application review and a Construction Application review. Credit SSc4.1 Alternative Transportation - Public Transportation, a Design credit, was not submitted during the Design Preliminary Application Review. The Design Preliminary Application is final, and was accepted by the design team and we are now in the Construction Application phase. Can I submit credit SSc4.1, a Design credit, with the Construction Review, or are only Construction credits able to be submitted with the Construction Application review?