Forum quick links
Exclusions from Regularly Occupied Spaces for Lab Spaces
CS-v4 EQc4:Daylightposted by Jordan Daniels on
I was wondering if someone can help here. Working on a v4 C&S 5 story building. Some of the tenant space on each floor is laboratory space (40% approximately of each floor).
Eco-Friendly worksafe solvents
posted by Robert Marsh on
Removing dust, dirt, allergens, and infection-causing agents like viruses is a key component of a healthy indoor environment and doing it in a Eco-friendly way is best of all the techniques.
Oops - broken chain of custody wood classification?
Pilot-Credits MRpc102:Legal Woodposted by Joanna Switzer on
Discovered in a project a little too late that FSC doors are being procured /handled by a non-FSC U.S.
Project registration
NC-v4 MPR1:Must be in a permanent location on existing landposted by Kavita Karmarkar on
I am posting this here as this question is not really applicable to any credits / MPR.
Is there a hard cut-off to when a project can register for LEEDv4 New Construction?
Possible innovation point / contact USGBC
NC-v4 INc1:Innovationposted by Kavita Karmarkar on
Hello all,
Conference Room vs. Meeting Room / Sliding doors
NC-v4 EQc9:Acoustic performanceposted by Kavita Karmarkar on
Hi everyone,
Applying IPpc90 beyond BD+C projects
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Alicia Daniels Uhlig on
Has anyone pursued this credit on a LEED for Homes Multifamily Midrise v2010 project?
Occupancy Calculations in LEEDv4
NC-v4 MPR3:Must comply with project size requirementsposted by Arathi Gowda on
In the new simplified Project Information forms there is no longer a calculator for FTE counts. Are teams using the historic v3 calculators to estimate FTE (along with the baked in assumptions)?
Documenting the calculation of 40% or more is achieved
CI-v4 LTc5:Reduced parking footprintposted by Keith Lam on
How do we justify the percentage reduction is more than 40%, is there some sort of documentation required to demonstrate our project is not utilizing parking spaces that are allocated on the&n
Round up or down for weekend daily trip average?
NC-v4 LTc5:Access to quality transitposted by Danielle Waters on
The project has 16 trips Saturday and 13 trips Sunday, and the average is 14.5 [(16+13)/2].
Can I assume rounding up to 15 daily trips for the entire weekend?