Forum quick links
Private Entity Recieving Asphault Waste
NC-2009 MRc2:Construction Waste Managementposted by Brian Harris on
Hi,
Specs for approved roll out mat that is less than 10'-0" in length
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Victor Caban-Diaz on
Does anybody have specs for an approved roll out mat that is less than 10'-0" in length that can be used for this credit?
expected volume
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Richardson Jean-Baptiste on
Hello all How would one know the expected volume for a building, as well as the frequency of collection for a new project? Can one reference a similar building (similar in s.f.
Preliminary and Final Design Review Submission - Online Steps for Final Design Review
posted by Stephen Sgro on
We received our preliminary design review report. All credits that were pending and ones requiring revisions have been revised and additional documents have been uploaded.
CALGreen certification as alternate to Watersense?
CI-v4 WEp1:Indoor water use reductionposted by Paladino "Team" on
Would GBCI accept a plumbing fixture that is CALGreen certified as an alternative compliance path to the Watersense requirement?
Eligible Diversion Materials
Mid-Rise-v4 MRc3:Construction waste managementposted by Kimberly Vermeer on
The waste management contractor for one of my projects is providing reports showing waste going to commingled processing companies.
Water Reduction Calculator for non-residential space
Mid-Rise-v4 WEc1:Total water useposted by Mugdha Mokashi on
The Water Reduction Calculator in the LEED v4_Homes and Multifamily Workbook only addresses the fixtures in units.
Innovation Catalog: Demand Response
CI-2009 IDc1:Innovation in Designposted by Margaret Montgomery on
I'm working on a CI project that encompasses nearly all of an office building that is owner-occupied and part of a larger campus.
Air Testing before Occupancy for phased move-in
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Karl Heitman on
How does LEED interpret occupancy date?
Does economic analysis to forgo DES phaseout apply in V4?
NC-v4 EAp4:Fundamental refrigerant managementposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
In the 2009 Reference Guide, an alternative path that allows foregoing DES plant replacement through an economic analysis that shows DES replacement is economically unfeasible is clearly stated.