Forum quick links
LEED boundary - urban infill project - LEED V4 C&S
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Thomas Gibbons on
Hi folks,
Carpet Tile as an Entryway System
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by James Keohane on
The Reference Guide for EQc1, Option 1- Entryway Systems describes entryway system in part ..…...
LEED User Concrete Tracking Form
NC-2009 MRc4:Recycled Contentposted by Melanie Blacklock on
Trying to use the LEED User Concrete Tracking Form for the first time to track fly ash. My question concerns Item I: Distances from both harvesting AND manufacturing point to project site (miles).
How to calculated for hybrid urinals
CI-2009 WEc1:Water Use Reductionposted by Susan Di Giulio on
Sloan has a new "hybrid" urinal that is basically waterless but does a pre-programmed, 1 gallon system flush every 72 hours. This solves a lot of maintenance and odor problems.
Vertical Expansion v. Horizontal Expansion
Healthcare-v4 MRc8:Design for flexibilityposted by Mary Couch on
Hello! I'm working on a project and we can only achieve Modular/Movable Casework, Vertical Expansion and Horizontal Expansion.
Heat Island Reduction: Parking under Cover
Healthcare-v4 SSc5:Heat island reductionposted by Mary Couch on
I am on a project currently where we are pursuing option one of the Heat Island credit, we are curious as to whether we are able to pursue option B as well.
Off site renewable eenergy EAc2
NC-2009 EAc2:On-Site Renewable Energyposted by Richardson Jean-Baptiste on
Hello! I have a project ( a new Science building on a college campus) under NC-2009.
Third-Party Certification and Labels for CHPS
NC-v4 EQc2:Low emitting materialsposted by Sara Greenwood on
Hello, I am working on a project that would like to use a product that has been tested to Section 01350.
How to use Title 24 2016 to comply with LEED 2009 EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Bo Yi on
Hi,
I am doing a LEED 2009 project. The project is in California and complied with Title 24 2016. I am trying to use title 24 to comply the LEED EAc 1. I have two questions.
Alternative Bike Network
Schools-NC-v4 LTc6:Bicycle facilitiesposted by Danielle Waters on
The school zone is located on a road with a 30 mph speed limit sign.