Option 3, Exterior wall repair and repointing
NC-v4 MRc1:Building life-cycle impact reductionposted by Edgar Arevalo on
For this project, certain brick enclosure sections of exterior wall area are to undergo repair and repoint since they are damaged. Since repair isn't necessarily considered replacement, which
NC-v4 LTc3: High priority site as ACP
NC-2009 SSc3:Brownfield Redevelopmentposted by Heather Appell on
Has anyone tried to pursue LEEDv4 LT High Priority Site as an alternative compliance path for SSc3 Brownfield Redevelopment?
CI-v4 LTc3 - Access to quality transit - trip questions
CI-v4 LTc3:Access to quality transitposted by Don Blair on
Question 1: If a city bus that serves a bus stop within a 1/4 mile of our project has bus trips only on weekdays and not on the weekend, can I still count the&nbs
Any way to exclude non-electrical consumption
NC-v4 EAc7:Green power and carbon offsetsposted by Edgar Arevalo on
The client wants us to pursue this credit with the hopes of achieving two points, for this project we are consuming both electricity and natural gas as per the energy model. However, the clie
Electrical Buses as an Innovation Credit
NC-v4 INc1:Innovationposted by on
A Mass transit project will be using Electric buses to serve the routes. As for LTc8 Green Vehicles, the project already has preferred parking and EV charging stations covered.
Option 2 - Priority Designation
CS-v4 LTc3:High priority siteposted by Peter Doo on
My project site has a mixed-use zoning designation by the County in which it resides.
Showerhead with dual spray settings
NC-v4 WEp2:Indoor water use reductionposted by Edgar Arevalo on
It is very hard to find a showerhead with 1.00 gpm, but finally found one with WaterSense label. The only exception is the head has a dual spray setting, which toggles between 1.00 gpm and 1.
LEED V4 BD+C vs ID+C
posted by Tracy Marquis on
We are renovating approximately 13,000 SF (with is about 50% of the first floor) of a 177,000 SF building. The renovation includes interior square footage as well as some major envelope work
Side Lighting - Clerestory
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
Hello everyone, happy Friday!
Following Strategy A but no D for regularly occupied space
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
I'm working on a project, where indirect overhead lighting for a regularly occupied space (garbage truck maintenance garage space) would not be feasible due to height restrictions for vehicle