Option 3, Exterior wall repair and repointing

NC-v4 MRc1:Building life-cycle impact reduction
posted by  Edgar Arevalo  on 

For this project, certain brick enclosure sections of exterior wall area are to undergo repair and repoint since they are damaged.  Since repair isn't necessarily considered replacement, which

0

NC-v4 LTc3: High priority site as ACP

NC-2009 SSc3:Brownfield Redevelopment
posted by  Heather Appell  on 

Has anyone tried to pursue LEEDv4 LT High Priority Site as an alternative compliance path for SSc3 Brownfield Redevelopment?

1
Tue Jul 23, 2019, 11:42 pm

CI-v4 LTc3 - Access to quality transit - trip questions

CI-v4 LTc3:Access to quality transit
posted by  Don Blair  on 

Question 1: If a city bus that serves a bus stop within a 1/4 mile of our project has bus trips only on weekdays and not on the weekend, can I still count the&nbs

0

Any way to exclude non-electrical consumption

NC-v4 EAc7:Green power and carbon offsets
posted by  Edgar Arevalo  on 

The client wants us to pursue this credit with the hopes of achieving two points, for this project we are consuming both electricity and natural gas as per the energy model.  However, the clie

1
Mon Jul 22, 2019, 10:03 pm

Electrical Buses as an Innovation Credit

NC-v4 INc1:Innovation
posted by     on 

A Mass transit project will be using Electric buses to serve the routes. As for LTc8 Green Vehicles, the project already has preferred parking and EV charging stations covered.

0

Option 2 - Priority Designation

CS-v4 LTc3:High priority site
posted by  Peter Doo  on 

My project site has a mixed-use zoning designation by the County in which it resides.

0

Showerhead with dual spray settings

NC-v4 WEp2:Indoor water use reduction
posted by  Edgar Arevalo  on 

It is very hard to find a showerhead with 1.00 gpm, but finally found one with WaterSense label.  The only exception is the head has a dual spray setting, which toggles between 1.00 gpm and 1.

1
Tue Jul 16, 2019, 8:05 pm

LEED V4 BD+C vs ID+C

LEED Rating System Selection
posted by  Tracy Marquis  on 

We are renovating approximately 13,000 SF (with is about 50% of the first floor) of a 177,000 SF building.  The renovation includes interior square footage as well as some major envelope work

5
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Jul 12, 2019, 6:48 pm
2
Sustainability Enabler
Eskew+Dumez+Ripple
LEEDuser Basic Member
20 thumbs up
Fri Jul 12, 2019, 6:06 pm

Following Strategy A but no D for regularly occupied space

NC-v4 EQc6:Interior lighting
posted by  Edgar Arevalo  on 

I'm working on a project, where indirect overhead lighting for a regularly occupied space (garbage truck maintenance garage space) would not be feasible due to height restrictions for vehicle

0