Forum quick links
No smoking signage without words
NC-v4 EQp2:Environmental tobacco smoke controlposted by Heather Belsey on
I'm working on a healthcare project where the client is planning on using just the no smoking symbol on the door with no words or 'language' attached. Just the cigarette crossed out - Is this
Bike storage for a hospital - regular building occupants count
Healthcare-v4 LTc6:Bicycle facilitiesposted by Carla Rincon on
Hello,
Greenhouse - SRI Value
NC-v4 SSc5:Heat island reductionposted by Irene Chung on
Can a greenhouse be excluded when doing credit calculation? If not, is there a default SRI that we can use for greenhouse roofs?
Biophilic design plan
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Priscillia Champagne on
I understand that the final result must be that the project implements five distinct design strategies.
Total Roof Area vs. Total Applicable Roof Area
CS-v4 SSc5:Heat island reductionposted by James Jin on
Hi all,
BeCx - Ongoing commissioning plan
NC-v4.1 EAc1:Enhanced Commissioningposted by Manuelle Croft on
The commissioning authority must complete Enhance Cx tasks for the building(s)'s thermal envelope. An ongoing commissioning plan must be developped.
Agile Working with specific temperature as Thermal Comfort Control
CI-v4 EQc5:Thermal comfortposted by Anik Bastien on
Hello,
Someone posted a similar question, but we pushed it a little bit futher and we would like to have your imput:
Long-term bicycle storage definition - Covered
NC-v4.1 LTc6:Bicycle Facilitiesposted by Luc Doucet on
Is there a guideline as to what constitutes an acceptable "covering" in order to obtain an adequately protected long-term bicycle storage from rain and snow?
IAQ Testing, Option 2: Air Testing - Path 1 and 2
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Nadia Bini on
We are pursing this credit under LEEDv4.1 Option 2: Air Testing, "Path 1: Particulate Matter and Inorganic Gases" and "Path 2: Volatile Organic Compounds".