NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.
EAp2 "USGBC approved equivalent"
NC-2009 EAp2:Minimum Energy Performanceposted by Susannah Goddard on
I am working on a project in the UK and the client wants to know what the alternatives are to ASHRAE 90.1 for energy modelling to demonstrate compliance with EAp2 and EAc1.
Process temperature controlled space
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Karen Elliott on
Hi I have a project where the temperature must be controlled automatically to ensure the manufactured product quality is maintained.
Toilets for customer use
Retail-CI-v4 WEc1:Indoor water use reductionposted by Karen Elliott on
We have a small retail unit with no toilet access for customers.
IEQp1&c2 Documentation
CI-2009 IEQp1:Minimum IAQ Performanceposted by Jordan Kirrane on
Hello, For my project building the mechanical engineer has provided me with his VAV sizing calculation spreadsheets for all zones and all floors.
Option 2 IAQ Testing - Schedule
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Anne-Claire BARBERI on
Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.
Rug
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Alicia Costas Freire on
Hello, I am working on a project where it is proposed to lay a rug directly on top of the raised floor in some areas.
Transportation Planning Handbook
NC-v4 LTc7:Reduced parking footprintposted by Susannah Goddard on
I don't have a copy of this to hand but need to know the content of Tables 18-2 to 18-4.
No smoking signage refused due to heritage building
Retail-CI-v4 EQp2:Environmental Tobacco Smoke Controlposted by Joanna Peacock on
This project is located on Regent Street, which is a very famous, historical shopping street in London.
Combination of New Build and Existing
NC-2009 EAp2:Minimum Energy Performanceposted by Jordan Kirrane on
Hello, I am working on the major renovation of an existing office building and new construction of a new entrance/reception atrium.