Forum quick links
Minimum planted area (that needs no irrigation)
CS-v4 WEc1:Outdoor water use reductionposted by Maria Porter on
Hi!
Batteries, mercury-containing lamps, and electronic waste
NC-v4 MRp1:Storage and collection of recyclablesposted by Maria Porter on
Chose to provide a recycling area for two of: batteries, mercury-containing lamps, and electronic waste.
Is this a Design or a Construction credit?
CS-v4.1 EAc5:Renewable Energyposted by Maria Porter on
Hi,
LEED EBOM v4 minimum occupancy requirements
EBOM-v4 EAp2:Minimum energy performanceposted by on
Hello,
Does LEED EBOM v4 require a minimum occupancy requirement to be able to be certified?
Smoking on roof
CS-v4 EQp2:Environmental tobacco smoke controlposted by Tobias Berge on
Do we need to prohibit smoking on the roof of a multi tenant office, hotell and retail building.
Alternative Energy Performance Metric for Swedish project
Pilot-Credits EApc95:Alternative Energy Performance Metricposted by Pia Öhrling on
We are trying to pursue this credit since it better reflects our building performance than the cost-metric and it also gives us more Points.
WE Prerequisite 1
EBOM-v4 WEp1:Indoor water use reductionposted by Alice Andersen on
I have a lavatory faucet that are automatically controlled (sensor control) and a flow rate of 5 l per minute. In accordance to the LEED manual the baseline is 1.9 l per minte.
Option 2 - Leadership Extraction Practices
CS-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Sara Johansson on
How can structure and shell only be allowed to contribute towards 30% of the compliant building material cost, when 25% is enough to fullfil this credit?
Tenant Guidelines credit substitution to v4?
CS-2009 SSc9:Tenant design and construction guidelinesposted by Maria Porter on
Now that Tenant Guidelines in v2009 are a bit dated, I’m referring to that CI v2009 no longer exists for new projects, wouldn’t it make more sense to use v4 credit requirements instead?
Exemplary Performance
CS-v4 EAc2:Optimize energy performanceposted by Maria Porter on
Is the Exemplary Performance threshold 54 % for CS as well (like NC?) The leap seems bigger for CS project than for NC Projects, based on that the table ends on 47 % for CS and 50 % for NC, both ac