Forum quick links
Acoustic performance: reverberation time
NC-v4 EQc9:Acoustic performanceposted by alessandro santuari on
Hi, we have a project with large waiting rooms: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide? Thanks
Water metering for Fire safety
Retail-NC-v4 WEc4:Water meteringposted by ilenia ottati on
Does water meter for fire emergency counts as additional meter for process water? In our project a tank is filled with water coming from municipal facility.
Existing building, physically sepatated from new construction
NC-2009 PIf2:Project Summary Detailsposted by FABIO VIERO on
We are working on a new constuction in Italy under LEED Certification (NC 2009). An existing building, physically sepatated from the new construction, is located inside the LEED Boundary.
Negative value of Monthly Landscape water requirement?
NC-v4 WEp1:Outdoor water use reductionposted by Francesco Passerini on
Dear all, I am performing the calculation for the Water Outdoor Prerequisite, with both excel for a Project located in Italy (Rome): 1. Water budget tool (downloaded from EPA) 2.
WE_Cr1 "Outdoor Water Use Reduction": Installation of a well
NC-v4 WEc1:Outdoor water use reductionposted by Francesco Passerini on
Is it possible to install a well specifically to collect groundwater for irrigation to meet the intent of the credit to reduce potable water use for irrigation?
Building area to site area ratio
CS-2009 PIf2:Project Summary Detailsposted by Giuseppina Amorusi on
Hi, I am doing an office tower (19 stories above grade).
Building Relocation
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Nativa Architecture on
If we decide to move a pavilion from Expo area to a new site, shall we take any "Building reuse" credits? All most of core and shell elements will be reused.
return fan for PTAC
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
G3.1.2.8 states: "If return or relief fans are specified in the proposed design, the baseline building design shall be also be modeled with fans serving the same functions (...)".
EA Credit 2
NC-2009 EAc2:On-Site Renewable Energyposted by Cristina Parenti on
Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..
Baseline existing building envelopes
NC-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hi, We are currently working on an existing building under major renovation, pursing a LEED certification following NC protocol v.2009.