Acoustic performance: reverberation time

NC-v4 EQc9:Acoustic performance
posted by  alessandro santuari  on 

Hi, we have a project with large waiting rooms: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide? Thanks

1
Tue Sep 26, 2023, 2:25 pm

Water metering for Fire safety

Retail-NC-v4 WEc4:Water metering
posted by  ilenia ottati  on 

Does water meter for fire emergency counts as additional meter for process water? In our project a tank is filled with water coming from municipal facility.

1
Tue Jul 11, 2017, 4:22 pm

Existing building, physically sepatated from new construction

NC-2009 PIf2:Project Summary Details
posted by  FABIO VIERO  on 

We are working on a new constuction in Italy under LEED Certification (NC 2009). An existing building, physically sepatated from the new construction, is located inside the LEED Boundary.

1
Mon Jan 19, 2015, 7:15 pm

Negative value of Monthly Landscape water requirement?

NC-v4 WEp1:Outdoor water use reduction
posted by  Francesco Passerini  on 

Dear all, I am performing the calculation for the Water Outdoor Prerequisite, with both excel for a Project located in Italy (Rome): 1. Water budget tool (downloaded from EPA) 2.

1
Thu Mar 17, 2016, 6:34 pm

WE_Cr1 "Outdoor Water Use Reduction": Installation of a well

NC-v4 WEc1:Outdoor water use reduction
posted by  Francesco Passerini  on 

Is it possible to install a well specifically to collect groundwater for irrigation to meet the intent of the credit to reduce potable water use for irrigation?

1
Thu May 4, 2017, 1:34 pm

Building area to site area ratio

CS-2009 PIf2:Project Summary Details
posted by  Giuseppina Amorusi  on 

Hi, I am doing an office tower (19 stories above grade).

1
Mon Oct 26, 2015, 4:39 pm

Building Relocation

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Nativa Architecture  on 

If we decide to move a pavilion from Expo area to a new site, shall we take any "Building reuse" credits? All most of core and shell elements will be reused.

1
Sat Aug 26, 2017, 9:53 pm

return fan for PTAC

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

G3.1.2.8 states: "If return or relief fans are specified in the proposed design, the baseline building design shall be also be modeled with fans serving the same functions (...)".

1
Fri Aug 19, 2016, 4:46 pm

EA Credit 2

NC-2009 EAc2:On-Site Renewable Energy
posted by  Cristina Parenti  on 

Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..

1
Fri May 26, 2017, 2:53 pm

Baseline existing building envelopes

NC-2009 EAp2:Minimum Energy Performance
posted by  FABIO VIERO  on 

Hi, We are currently working on an existing building under major renovation, pursing a LEED certification following NC protocol v.2009.