Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

% of Herbs required

Pilot-Credits SSpc82:Local food production
posted by  Francesco Passerini  on 

Hello, we want to pursue this credit, but we have a doubt. Under all project description says "Herbs used for food preparation shall not exceed 25% of the area requirement.

1
Mon Jan 15, 2018, 3:35 pm

Threat Factor Calculation

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Francesco Passerini  on 

Hi I've been working on a project where I want to purse this pilot credit.

1
Thu Jan 11, 2018, 2:52 pm

Area under a covered walkway

NC-v4 SSc3:Open space
posted by  Francesco Passerini  on 

Could be the area under a covered walkway (an exterior portico) be considered as an open space?

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Wed Jan 3, 2018, 4:34 pm

Ventilation in the garage with OPTION 2

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

We are going to demonstrate the compliance with the prerequisite using OPTION 2. CEN STANDARDS EN 15251–2007 AND EN 13779–2007.

1
Tue Dec 19, 2017, 7:55 am

ICOP AHRI 340/360

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

As for the mandatory provisions according to ASHRAE 90.1-2007, Tab. 6.8.1A refers to ICOP with test procedure AHRI 340/360.

0
1
Mon Jan 22, 2018, 5:40 pm

infirmary

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

We are dealing with an educational building and we are considering ASHRAE 62.1-2010. Inside there is an infirmary.

Which occupancy category shall I consider for that space?

1
Mon Oct 9, 2017, 2:54 pm
4
Sustainability Consultant; Project Manager
Henderson Engineers and Sustainable Design Consulting, LLC
LEEDuser Basic Member
9 thumbs up
Mon Oct 2, 2017, 3:59 pm

n/a

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

G3.1.2.5 states: Ventilation.

1
Fri Jun 3, 2016, 2:49 pm

Demolished and rebuilt envelope

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

If the envelope is demolished and then rebuilt with the same shape does Table G3.1 part 5., baseline, point f apply?

1
Mon Apr 17, 2017, 2:25 pm